0584090312002

Well Details

Well ID: 0584090312002
Loading map...
Location: 00/12-03-058-09W4/2
Location Alias: 00/12-03-58-09 W4M
Location Alias 2: 00/12-03-058-09 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 09
Section: 03
County/Municipality: St. Paul
Well Name: OMERS ENERGY ST.PAUL 12-3-58-9
Operator Name: AlphaBow Energy Ltd.
License Number: 0024941
License Date: 1963-10-10
License Status: Abandoned
Spud Date: 1963-10-10
Final Drill Date: 1963-10-13
Well Total Depth: 493.80 m
Surface Hole Latitude: 53.986258
Surface Hole Longitude: -111.264347

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-10-10 Obtained License
1963-10-13 Finished Drilling
1963-10-13 Well Mode changed to Drilled and Cased
1963-10-14 Production Casing Operation Performed
1963-10-16 Perforation Treatment Performed - Jet Perforation
1999-07-09 Perforation Treatment Performed - Jet Perforation
1999-08-25 Well Log Performed
2000-09-19 Well Began Production
2000-09-19 Well Fluid changed to Gas
2000-09-19 Well Mode changed to Flowing
2009-03-01 Well Fluid changed to Gas
2009-03-01 Well Mode changed to Suspended
2009-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-02 Plug Back Performed
2009-06-02 Well Fluid changed to Gas
2009-06-02 Well Mode changed to Abandoned Zone
2009-06-22 Well Abandoned
2009-06-22 Well Fluid changed to Gas
2009-06-22 Well Mode changed to Abandoned
2015-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-07 Perforation Treatment Performed - Jet Perforation
2015-10-07 Plug Back Performed
2015-10-13 Perforation Treatment Performed - Jet Perforation
2015-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-14 Plug Back Performed
2015-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-15 Perforation Treatment Performed - Jet Perforation
2015-10-15 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-10-16 Perforation 468.80 471.20 13
2015-10-15 Perforation 60.00 61.00 17
2015-10-15 Packing Device Capped w/Cement 44.00 52.00 0
1999-07-09 Perforation 438.30 439.80 13
1999-07-09 Perforation 428.30 429.80 13
2009-06-02 Packing Device Capped w/Cement 449.00 459.00 0
2009-06-02 Packing Device Capped w/Cement 416.00 424.00 0
2015-10-07 Perforation 165.00 166.00 17
2015-10-07 Packing Device Capped w/Cement 151.00 159.00 0
2015-10-13 Perforation 105.00 106.00 17
2015-10-14 Packing Device Capped w/Cement 91.00 99.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 2490 0.0 0.0 0.0
2001 8469 0.0 0.0 0.0
2002 8669 0.0 0.0 0.0
2003 8679 0.0 0.0 0.0
2004 8670 0.0 0.0 0.0
2005 8653 0.0 0.0 0.0
2006 6690 0.0 0.0 0.0
2007 8637 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-17 No Incident Encountered 0.00 0.00

For data sources see[6]