If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0576063403004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.970992,"lon":-118.80138,"icon":""}]} |
Location: 00/03-34-057-06W6/4 | |
Location Alias: 00/03-34-57-06 W6M | |
Location Alias 2: 00/03-34-057-06 W6/04 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 6 | |
Range: 06 | |
Section: 34 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CNRL ET AL FINDLEY 7-34-57-6 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0219758 | |
License Date: 1998-12-11 | |
License Status: Amended | |
Spud Date: 1998-12-28 | |
Final Drill Date: 1999-04-09 | |
Well Total Depth: 3176.00 m | |
Surface Hole Latitude: 53.970992 | |
Surface Hole Longitude: -118.801380 |
Date | Event |
---|---|
1998-12-11 | Obtained License |
1998-12-29 | Direction Drilling Operation Performed - Deviate |
1999-01-22 | Direction Drilling Operation Performed - Sidetrack Fish |
1999-01-29 | Intermediate Casing Operation Performed |
1999-02-02 | Kick Occurred |
1999-02-05 | Water Flow Occurred |
1999-03-08 | Well Log Performed |
1999-03-09 | Well Log Performed |
1999-03-11 | Drill Stem Test Performed |
1999-03-18 | Production Casing Operation Performed |
1999-04-04 | Kick Occurred |
1999-04-09 | Finished Drilling |
1999-04-09 | Perforation Treatment Performed - Open-Hole Completion |
1999-04-09 | Well Log Performed |
1999-04-09 | Well Mode changed to Drilled and Cased |
1999-04-10 | Well Log Performed |
1999-04-13 | Rig Released |
1999-04-16 | Well Log Performed |
1999-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-10-14 | Perforation Treatment Performed - Cement Plug |
2000-10-21 | Perforation Treatment Performed - Cement Plug |
2000-10-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-10-24 | Perforation Treatment Performed - Cement Plug |
2000-10-24 | Plug Back Performed |
2000-10-25 | Perforation Treatment Performed - Jet Perforation |
2000-11-01 | Perforation Treatment Performed - Fractured |
2000-11-03 | Well Log Performed |
2000-11-04 | Perforation Treatment Performed - Jet Perforation |
2000-11-04 | Well Mode changed to Drilled and Cased |
2000-11-08 | Perforation Treatment Performed - Fractured |
2001-06-28 | Well Began Production |
2001-06-28 | Well Fluid changed to Gas |
2001-06-28 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1998-12-29 | 114.00 | Deviate (5 - 79 degrees) |
1999-01-22 | 1155.00 | Sidetrack fish |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-04-09 | Open Hole/Barefoot Completion | 2773.00 | 3176.00 | 0 |
2000-11-04 | Perforation | 1630.00 | 1636.00 | 16 |
2000-11-08 | Fracture | 1630.00 | 1636.00 | 0 |
1999-07-22 | Acid Treatment | 2773.00 | 3176.00 | 0 |
1999-07-24 | Acid Treatment | 2773.00 | 3176.00 | 0 |
2000-10-14 | Cement Plug | 2853.00 | 3090.00 | 0 |
2000-10-21 | Cement Plug | 2771.00 | 2853.00 | 0 |
2000-10-24 | Cement Plug | 2755.00 | 2771.00 | 0 |
2000-10-24 | Packing Device Capped w/Cement | 2392.00 | 2400.00 | 0 |
2000-10-25 | Perforation | 2275.00 | 2281.00 | 17 |
2000-11-01 | Fracture | 2275.00 | 2281.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 4257 | 0.0 | 0.0 | 0.0 |
2002 | 8225 | 0.0 | 0.0 | 0.0 |
2003 | 7942 | 0.0 | 0.0 | 0.0 |
2004 | 8558 | 0.0 | 0.0 | 0.0 |
2005 | 8598 | 0.0 | 0.0 | 0.0 |
2006 | 8524 | 0.0 | 0.0 | 0.0 |
2007 | 8367 | 0.0 | 0.0 | 0.0 |
2008 | 8088 | 0.0 | 0.0 | 0.0 |
2009 | 6141 | 0.0 | 0.0 | 0.0 |
2010 | 7499 | 0.0 | 0.0 | 0.0 |
2011 | 8494 | 0.0 | 0.0 | 0.0 |
2012 | 7916 | 0.0 | 0.0 | 0.0 |
2013 | 8174 | 0.0 | 0.0 | 0.0 |
2014 | 7239 | 0.0 | 0.0 | 0.0 |
2015 | 5583 | 0.0 | 0.0 | 0.0 |
2016 | 8066 | 0.0 | 0.0 | 0.0 |
2017 | 6576 | 0.0 | 0.0 | 0.0 |
2018 | 8711 | 0.0 | 0.0 | 0.0 |
2019 | 6359 | 0.0 | 0.0 | 0.0 |
2020 | 480 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1999-02-02 | Kick | 1651.00 | 1671.00 |
1999-02-05 | Water Flow | 1739.00 | 1739.00 |
1999-04-04 | Kick | 3111.00 | 3111.00 |
For data sources see[7]