X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0576062611002

Well Details

Well ID: 0576062611002
Loading map...
Location: 00/11-26-057-06W6/2
Location Alias: 00/11-26-57-06 W6M
Location Alias 2: 00/11-26-057-06 W6/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 6
Range: 06
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: PDS FINDLEY 11-26-57-6
Operator Name: Wolverine Energy And Infrastructure Inc.
License Number: 0052394
License Date: 1975-01-07
License Status: Issued
Spud Date: 1975-01-12
Final Drill Date: 1975-07-28
Well Total Depth: 3749.00 m
Surface Hole Latitude: 53.955093
Surface Hole Longitude: -118.787087

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-01-07 Obtained License
1975-05-07 Well Log Performed
1975-05-09 Well Log Performed
1975-05-19 Drill Stem Test Performed
1975-05-21 Drill Stem Test Performed
1975-06-03 Drill Stem Test Performed
1975-07-06 Well Log Performed
1975-07-09 Well Log Performed
1975-07-28 Finished Drilling
1975-07-28 Well Log Performed
1975-08-02 Production Casing Operation Performed
1975-09-08 Perforation Treatment Performed - Jet Perforation
1975-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-21 Perforation Treatment Performed - Jet Perforation
1975-11-05 Perforation Treatment Performed - Fractured
1975-11-14 Perforation Treatment Performed - Jet Perforation
1975-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-01 Perforation Treatment Performed - Cement Squeeze
1975-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-12-02 Perforation Treatment Performed - Jet Perforation
1975-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-09 Perforation Treatment Performed - Fractured
1975-12-20 Perforation Treatment Performed - Jet Perforation
1976-01-19 Well Mode changed to Drilled and Cased
1976-01-23 Well Log Performed
1993-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-14 Perforation Treatment Performed - Jet Perforation
1999-02-23 Well Began Production
1999-02-23 Well Fluid changed to Gas
1999-02-23 Well Mode changed to Flowing
1999-03-01 Well Fluid changed to Gas
1999-03-01 Well Mode changed to Flowing
1999-03-02 Well Structure changed to Commingled
2004-08-11 Well Log Performed
2004-08-12 Well Log Performed
2005-01-01 Well Began Injection
2005-01-01 Well Fluid changed to Water
2005-01-01 Well Type changed to Injection
2005-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-07-21 Perforation Treatment Performed - Fractured
2007-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-06 Perforation Treatment Performed - Jet Perforation
2009-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-06-01 Well Fluid changed to Water
2012-06-01 Well Mode changed to Suspended
2012-06-01 Well Type changed to Injection
2015-09-01 Well Fluid changed to Water
2015-09-01 Well Type changed to Disposal
2016-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-06-13 Perforation Treatment Performed - Fractured
2017-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-08 Perforation 2762.10 2767.60 7
1975-11-14 Perforation 2515.20 2524.40 7
1975-11-14 Perforation 2536.50 2546.30 7
1975-11-21 Acid Treatment 2515.20 2546.30 0
1975-12-01 Cement Squeeze 2515.20 2546.30 0
1975-12-02 Packing Device Capped w/Cement 2505.00 2513.00 0
1975-12-02 Perforation 2454.90 2457.00 7
1975-12-02 Perforation 2458.80 2460.70 7
1975-12-02 Perforation 2473.80 2479.20 7
1975-12-02 Perforation 2482.30 2493.30 7
1975-12-02 Perforation 2495.70 2498.40 7
1975-09-08 Perforation 2779.20 2782.80 7
1975-12-08 Acid Treatment 2454.90 2498.40 0
1975-12-09 Fracture 2454.90 2498.40 0
1975-12-20 Perforation 2375.60 2381.10 7
1975-12-20 Perforation 2384.80 2386.60 7
1975-12-20 Perforation 2398.20 2402.40 7
1993-11-15 Packing Device Capped w/Cement 2350.00 2358.00 0
1998-01-14 Perforation 2454.90 2457.00 7
1998-01-14 Perforation 2458.80 2460.70 7
1998-01-14 Perforation 2473.80 2479.20 7
1998-01-14 Perforation 2482.30 2493.30 7
1975-09-08 Perforation 2786.50 2790.70 7
1998-01-14 Perforation 2495.70 2498.40 7
1998-01-14 Perforation 2375.60 2381.10 7
1998-01-14 Perforation 2384.80 2386.60 7
1998-01-14 Perforation 2398.20 2402.40 7
2005-12-01 Acid Treatment 2375.60 2402.40 0
2005-12-21 Acid Treatment 2375.60 2402.40 0
2007-07-21 Fracture 2375.60 2402.40 0
2007-09-28 Acid Treatment 2375.60 2402.40 0
2008-07-25 Acid Treatment 2375.60 2402.40 0
2009-02-06 Perforation 2375.60 2381.10 14
1975-09-08 Perforation 2795.60 2798.10 7
2009-02-06 Perforation 2384.20 2386.60 14
2009-02-06 Perforation 2398.20 2402.40 14
2009-02-06 Perforation 2454.90 2457.00 14
2009-02-06 Perforation 2458.80 2460.70 14
2009-02-06 Perforation 2473.80 2479.30 14
2009-02-06 Perforation 2482.30 2488.30 14
2009-02-06 Perforation 2486.50 2491.50 14
2009-02-07 Acid Treatment 2454.90 2491.50 0
2009-02-08 Acid Treatment 2375.60 2402.40 0
2016-03-24 Acid Treatment 2375.60 2381.10 0
1975-09-13 Acid Treatment 2762.10 2798.10 0
2016-03-24 Acid Treatment 2384.80 2386.60 0
2016-03-24 Acid Treatment 2398.20 2402.40 0
2016-03-24 Acid Treatment 2454.90 2457.00 0
2016-03-24 Acid Treatment 2458.80 2460.70 0
2016-03-24 Acid Treatment 2473.80 2479.20 0
2016-03-24 Acid Treatment 2482.30 2493.30 0
2016-03-24 Acid Treatment 2486.50 2491.50 0
2016-03-24 Acid Treatment 2495.70 2498.40 0
2017-06-13 Fracture 2375.60 2381.10 0
2017-06-13 Fracture 2384.20 2386.60 0
1975-10-13 Acid Treatment 2762.10 2798.10 0
2017-06-13 Fracture 2398.20 2402.40 0
2017-06-13 Fracture 2454.90 2457.00 0
2017-06-13 Fracture 2458.80 2460.70 0
2017-06-13 Fracture 2473.80 2479.20 0
2017-06-13 Fracture 2482.30 2493.30 0
2017-06-13 Fracture 2486.50 2491.50 0
2017-06-13 Fracture 2495.70 2498.40 0
2017-09-01 Acid Treatment 2375.60 2498.40 0
2018-01-07 Acid Treatment 2375.60 2498.40 0
2018-02-20 Acid Treatment 2375.60 2498.40 0
1975-10-21 Perforation 2693.20 2695.00 7
1975-10-21 Perforation 2699.00 2701.70 7
1975-11-05 Fracture 2693.20 2701.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-03-23 No Incident Encountered 0.00 0.00
2017-05-30 No Incident Encountered 0.00 0.00
2017-09-01 No Incident Encountered 0.00 0.00
2018-01-08 No Incident Encountered 0.00 0.00
2018-02-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References