If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0576062316000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.945456,"lon":-118.771458,"icon":""}]} |
Location: 00/16-23-057-06W6/0 | |
Location Alias: 00/16-23-57-06 W6M | |
Location Alias 2: 00/16-23-057-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 6 | |
Range: 06 | |
Section: 23 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CNRL FINDLEY 16-23-57-6 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0056874 | |
License Date: 1976-02-02 | |
License Status: Suspension | |
Spud Date: 1976-02-03 | |
Final Drill Date: 1976-07-16 | |
Well Total Depth: 3511.30 m | |
Surface Hole Latitude: 53.945456 | |
Surface Hole Longitude: -118.771458 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-02-02 | Obtained License |
1976-02-19 | Well Log Performed |
1976-03-12 | Drill Stem Test Performed |
1976-03-30 | Drill Stem Test Performed |
1976-04-03 | Lost Circulation Occurred |
1976-04-04 | Drill Stem Test Performed |
1976-04-09 | Drill Stem Test Performed |
1976-04-21 | Well Log Performed |
1976-04-22 | Well Log Performed |
1976-04-23 | Drill Stem Test Performed |
1976-04-24 | Drill Stem Test Performed |
1976-04-28 | Lost Circulation Occurred |
1976-05-14 | Lost Circulation Occurred |
1976-05-26 | Well Log Performed |
1976-07-16 | Finished Drilling |
1976-07-16 | Well Log Performed |
1976-07-19 | Liner Casing Operation Performed |
1976-08-25 | Well Log Performed |
1976-09-28 | Well Log Performed |
1976-09-29 | Perforation Treatment Performed - Jet Perforation |
1976-10-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-10-01 | Perforation Treatment Performed - Cement Squeeze |
1976-10-10 | Perforation Treatment Performed - Jet Perforation |
1976-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-10-17 | Perforation Treatment Performed - Jet Perforation |
1976-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-10-21 | Perforation Treatment Performed - Jet Perforation |
1976-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-11-05 | Perforation Treatment Performed - Jet Perforation |
1976-11-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-11-10 | Perforation Treatment Performed - Jet Perforation |
1976-11-11 | Perforation Treatment Performed - Cement Squeeze |
1976-11-13 | Perforation Treatment Performed - Cement Squeeze |
1976-11-18 | Perforation Treatment Performed - Jet Perforation |
1976-11-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-11-23 | Perforation Treatment Performed - Jet Perforation |
1976-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-12-03 | Perforation Treatment Performed - Jet Perforation |
1976-12-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-12-21 | Well Log Performed |
1977-01-13 | Perforation Treatment Performed - Jet Perforation |
1977-01-14 | Perforation Treatment Performed - Cement Squeeze |
1977-01-30 | Well Log Performed |
1977-01-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1977-02-01 | Perforation Treatment Performed - Jet Perforation |
1977-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-02-20 | Perforation Treatment Performed - Jet Perforation |
1977-02-25 | Perforation Treatment Performed - Jet Perforation |
1977-02-27 | Perforation Treatment Performed - Jet Perforation |
1977-03-05 | Perforation Treatment Performed - Acid Wash - No Pressure |
1977-03-15 | Perforation Treatment Performed - Acid Wash - No Pressure |
1977-03-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-03-22 | Perforation Treatment Performed - Jet Perforation |
1977-04-15 | Well Mode changed to Drilled and Cased |
1993-11-07 | Well Log Performed |
2018-12-07 | Perforation Treatment Performed - Cement Plug |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-09-29 | Perforation | 2545.70 | 2546.90 | 7 |
1976-10-26 | Packing Device Capped w/Cement | 3087.60 | 3087.60 | 0 |
1976-11-04 | Packing Device Capped w/Cement | 3032.80 | 3032.80 | 0 |
1976-11-05 | Perforation | 2972.40 | 2976.10 | 7 |
1976-11-09 | Packing Device Capped w/Cement | 2944.40 | 2944.40 | 0 |
1976-11-10 | Perforation | 1112.50 | 1113.10 | 13 |
1976-11-11 | Cement Squeeze | 1112.50 | 1113.10 | 0 |
1976-11-13 | Cement Squeeze | 1112.50 | 1113.10 | 0 |
1976-11-18 | Perforation | 2868.80 | 2870.60 | 7 |
1976-11-18 | Perforation | 2873.00 | 2876.40 | 7 |
1976-11-22 | Packing Device Capped w/Cement | 2843.80 | 2843.80 | 0 |
1976-10-01 | Acid Treatment | 2545.70 | 2546.90 | 0 |
1976-11-23 | Perforation | 2815.70 | 2819.10 | 7 |
1976-11-23 | Perforation | 2820.90 | 2823.40 | 7 |
1976-12-01 | Packing Device Capped w/Cement | 2792.00 | 2792.00 | 0 |
1976-12-03 | Perforation | 2737.70 | 2738.00 | 7 |
1976-12-03 | Perforation | 2738.90 | 2744.40 | 7 |
1976-12-03 | Perforation | 2730.70 | 2733.10 | 7 |
1976-12-03 | Perforation | 2734.10 | 2737.70 | 7 |
1976-12-08 | Acid Treatment | 2730.70 | 2744.40 | 0 |
1976-12-16 | Acid Treatment | 2730.70 | 2744.40 | 0 |
1977-01-13 | Perforation | 2767.30 | 2767.60 | 26 |
1976-10-01 | Cement Squeeze | 2545.70 | 2546.90 | 0 |
1977-01-14 | Cement Squeeze | 2767.30 | 2767.60 | 0 |
1977-01-31 | Packing Device Capped w/Cement | 2680.70 | 2688.30 | 0 |
1977-02-01 | Perforation | 2515.20 | 2517.00 | 7 |
1977-02-01 | Perforation | 2521.30 | 2523.10 | 7 |
1977-02-01 | Perforation | 2527.40 | 2529.50 | 7 |
1977-02-13 | Acid Treatment | 2515.20 | 2529.50 | 0 |
1977-02-20 | Perforation | 2398.80 | 2405.50 | 7 |
1977-02-20 | Perforation | 2408.50 | 2414.00 | 7 |
1977-02-20 | Perforation | 2419.80 | 2426.20 | 7 |
1977-02-25 | Perforation | 2391.50 | 2398.20 | 7 |
1976-10-10 | Perforation | 3468.60 | 3475.60 | 7 |
1977-02-27 | Perforation | 2391.50 | 2398.20 | 7 |
1977-03-05 | Acid Wash | 2391.50 | 2426.20 | 0 |
1977-03-15 | Acid Wash | 2391.50 | 2426.20 | 0 |
1977-03-18 | Acid Treatment | 2391.50 | 2426.20 | 0 |
1977-03-22 | Perforation | 2382.00 | 2387.80 | 13 |
2018-12-07 | Cement Plug | 225.00 | 260.00 | 0 |
1976-10-13 | Packing Device Capped w/Cement | 3409.80 | 3409.80 | 0 |
1976-10-17 | Perforation | 3268.10 | 3275.40 | 7 |
1976-10-20 | Packing Device Capped w/Cement | 3244.60 | 3244.60 | 0 |
1976-10-21 | Perforation | 3112.60 | 3123.60 | 7 |
1976-10-21 | Perforation | 3130.30 | 3135.80 | 7 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1976-04-03 | Lost Circulation | 2046.10 | 2061.40 |
1976-04-28 | Lost Circulation | 2346.00 | 2356.10 |
1976-05-14 | Lost Circulation | 2464.30 | 2473.20 |
2018-12-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]