X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0576050616000

Well Details

Well ID: 0576050616000
Loading map...
Location: 00/16-06-057-05W6/0
Location Alias: 00/16-06-57-05 W6M
Location Alias 2: 00/16-06-057-05 W6/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 6
Range: 05
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: PANTERRA RES MINNOW 16-6-57-5
Operator Name: Pieridae Alberta Production Ltd.
License Number: 0301426
License Date: 2004-01-13
License Status: RecCertified
Spud Date: 2004-02-02
Final Drill Date: 2005-09-01
Well Total Depth: 2050.30 m
Surface Hole Latitude: 53.903037
Surface Hole Longitude: -118.720186

For data sources see[1][2]

Well History

Date Event
2004-01-13 Obtained License
2004-02-04 Surface Casing Operation Performed
2004-02-12 Direction Drilling Operation Performed - Deviate
2004-02-15 Well Log Performed
2004-02-15 Well Mode changed to Drilled and Cased
2004-02-16 Well Log Performed
2004-02-17 Intermediate Casing Operation Performed
2004-02-17 Rig Released
2004-03-28 Perforation Treatment Performed - Open-Hole Completion
2005-09-01 Finished Drilling
2005-09-01 Perforation Treatment Performed - Open-Hole Completion
2005-09-03 Well Log Performed
2005-09-04 Well Log Performed
2005-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-06 Perforation Treatment Performed - Jet Perforation
2005-09-06 Plug Back Performed
2005-09-06 Well Log Performed
2005-09-06 Well Mode changed to Abandoned Zone
2005-09-08 Perforation Treatment Performed - Fractured
2008-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-02 Plug Back Performed
2008-03-03 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-02-12 1740.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-03-28 Open Hole/Barefoot Completion 1990.00 2048.60 0
2005-09-01 Open Hole/Barefoot Completion 2048.60 2050.30 0
2005-09-06 Packing Device Capped w/Cement 1976.80 1984.80 0
2005-09-06 Perforation 1793.00 1799.00 20
2005-09-08 Fracture 1793.00 1799.00 0
2008-03-02 Packing Device Capped w/Cement 1780.00 1788.00 0

For data sources see[5]



References