X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0576021312002

Well Details

Well ID: 0576021312002
Loading map...
Location: 00/12-13-057-02W6/2
Location Alias: 00/12-13-57-02 W6M
Location Alias 2: 00/12-13-057-02 W6/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 6
Range: 02
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ SMOKY 12-13-57-2
Operator Name: Tourmaline Oil Corp.
License Number: 0486199
License Date: 2017-11-08
License Status: Amended
Spud Date: 2017-12-15
Final Drill Date: 2018-02-08
Well Total Depth: 5860.00 m
Surface Hole Latitude: 53.925371
Surface Hole Longitude: -118.135773

For data sources see[1][2]

Well History

Date Event
2017-11-08 Obtained License
2017-12-17 Surface Casing Operation Performed
2017-12-21 Intermediate Casing Operation Performed
2018-01-23 Direction Drilling Operation Performed - Deviate
2018-01-25 Direction Drilling Operation Performed - Horizontal
2018-02-02 Direction Drilling Operation Performed - Horizontal
2018-02-08 Finished Drilling
2018-02-08 Well Mode changed to Drilled and Cased
2018-02-09 Well Log Performed
2018-02-11 Production Casing Operation Performed
2018-02-11 Rig Released
2018-02-18 Well Log Performed
2018-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-02 Well Began Production
2018-03-02 Well Fluid changed to Gas
2018-03-02 Well Mode changed to Flowing
2018-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-04 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-01-23 3275.50 Deviate (5 - 79 degrees)
2018-01-25 3694.70 Horizontal
2018-02-02 4535.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-02 Multi-Stage Fracture 5796.30 5796.40 0
2018-03-03 Multi-Stage Fracture 5219.80 5219.90 0
2018-03-03 Multi-Stage Fracture 5154.20 5154.30 0
2018-03-03 Multi-Stage Fracture 5088.40 5088.50 0
2018-03-03 Multi-Stage Fracture 5022.80 5022.90 0
2018-03-03 Multi-Stage Fracture 4957.80 4957.90 0
2018-03-03 Multi-Stage Fracture 4892.40 4892.50 0
2018-03-03 Multi-Stage Fracture 4827.00 4827.10 0
2018-03-03 Multi-Stage Fracture 4761.30 4761.40 0
2018-03-03 Multi-Stage Fracture 4696.00 4696.10 0
2018-03-04 Multi-Stage Fracture 4630.20 4630.30 0
2018-03-02 Multi-Stage Fracture 5741.80 5741.90 0
2018-03-04 Multi-Stage Fracture 4564.40 4564.50 0
2018-03-04 Multi-Stage Fracture 4498.70 4498.80 0
2018-03-04 Multi-Stage Fracture 4433.10 4433.20 0
2018-03-04 Multi-Stage Fracture 4367.40 4367.50 0
2018-03-04 Multi-Stage Fracture 4301.80 4301.90 0
2018-03-04 Multi-Stage Fracture 4236.10 4236.20 0
2018-03-04 Multi-Stage Fracture 4170.50 4170.60 0
2018-03-04 Multi-Stage Fracture 4104.80 4104.90 0
2018-03-04 Multi-Stage Fracture 4039.20 4039.30 0
2018-03-04 Multi-Stage Fracture 3973.50 3973.60 0
2018-03-02 Multi-Stage Fracture 5676.10 5676.20 0
2018-03-04 Multi-Stage Fracture 3908.00 3908.10 0
2018-03-04 Multi-Stage Fracture 3829.60 3829.70 0
2018-03-04 Multi-Stage Fracture 3738.90 3739.00 0
2018-03-02 Multi-Stage Fracture 5611.00 5611.10 0
2018-03-02 Multi-Stage Fracture 5545.20 5545.30 0
2018-03-02 Multi-Stage Fracture 5480.40 5480.50 0
2018-03-03 Multi-Stage Fracture 5415.70 5415.80 0
2018-03-03 Multi-Stage Fracture 5350.40 5350.50 0
2018-03-03 Multi-Stage Fracture 5285.10 5285.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-02 2018-03-04 3,567 8,142 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.4763 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.2903 N/A
silica crystalline 14808-60-7 100 3.2903 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 9.8394 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.6103 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0111 N/A
dibromoacetonitrile 3252-43-5 100 0.0111 N/A
non-hazardous ingredients Not Available 100 0.0111 N/A
polyethylene glycol 25322-68-3 100 0.0111 N/A
sodium bromide 7647-15-6 100 0.0111 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0907 N/A
water Not Available 100 0.0907 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0488 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0488 N/A
non-hazardous ingredients Not Available 100 0.0488 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.043 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.043 N/A
methanol 67-56-1 100 0.043 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.043 N/A
non-hazardous ingredients Not Available 100 0.043 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-20 2018-02-20 Recycled Fracturing Water (treated at well site) 1983
2018-02-21 2018-02-21 Oilfield Produced Water 296
2018-02-28 2018-03-02 Recycled Fracturing Water (treated at well site) 2924
2018-02-24 2018-02-28 Recycled Fracturing Water (treated at well site) 2939

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7117 0.0 0.0 0.0
2019 8751 0.0 0.0 0.0
2020 2034 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-08 No Incident Encountered 0.00 0.00
2018-03-18 No Incident Encountered 0.00 0.00

For data sources see[9]

References