X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575263113000

Well Details

Well ID: 0575263113000
Loading map...
Location: 00/13-31-057-26W5/0
Location Alias: 00/13-31-57-26 W5M
Location Alias 2: 00/13-31-057-26 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 26
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE ET AL LELAND 13-31-57-26
Operator Name: Tourmaline Oil Corp.
License Number: 0426017
License Date: 2010-11-18
License Status: Issued
Spud Date: 2011-02-07
Final Drill Date: 2011-02-26
Well Total Depth: 3313.00 m
Surface Hole Latitude: 53.975795
Surface Hole Longitude: -117.863776

For data sources see[1][2]

Well History

Date Event
2010-11-18 Obtained License
2011-02-11 Surface Casing Operation Performed
2011-02-26 Finished Drilling
2011-02-26 Well Mode changed to Drilled and Cased
2011-02-27 Well Log Performed
2011-03-01 Production Casing Operation Performed
2011-03-02 Rig Released
2011-03-07 Well Log Performed
2011-03-09 Perforation Treatment Performed - Jet Perforation
2011-03-09 Well Log Performed
2011-03-14 Perforation Treatment Performed - Fractured
2011-03-14 Well Log Performed
2011-03-15 Perforation Treatment Performed - Fractured
2011-03-15 Perforation Treatment Performed - Jet Perforation
2011-03-16 Perforation Treatment Performed - Fractured
2011-03-16 Perforation Treatment Performed - Jet Perforation
2011-03-16 Well Log Performed
2011-03-17 Perforation Treatment Performed - Fractured
2011-03-17 Perforation Treatment Performed - Jet Perforation
2011-03-17 Well Log Performed
2011-04-07 Well Began Production
2011-04-07 Well Fluid changed to Gas
2011-04-07 Well Mode changed to Flowing
2012-02-13 Well Fluid changed to Gas
2012-02-13 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-09 Perforation 3281.50 3282.50 6
2011-03-15 Fracture 3123.00 3204.50 0
2011-03-15 Perforation 3055.50 3056.50 6
2011-03-16 Perforation 2992.00 2993.00 6
2011-03-16 Perforation 2935.00 2936.00 6
2011-03-16 Perforation 2848.00 2849.00 6
2011-03-16 Fracture 2848.00 3056.50 0
2011-03-16 Perforation 2711.00 2712.00 6
2011-03-16 Perforation 2690.00 2691.00 6
2011-03-16 Perforation 2653.00 2654.00 3
2011-03-17 Fracture 2653.00 2712.00 0
2011-03-09 Perforation 3265.00 3266.00 9
2011-03-17 Perforation 2293.50 2294.50 6
2011-03-17 Perforation 2287.50 2288.50 6
2011-03-17 Perforation 2181.50 2182.50 3
2011-03-17 Fracture 2181.50 2294.50 0
2011-03-09 Perforation 3240.00 3241.00 6
2011-03-09 Perforation 3228.00 3229.00 6
2011-03-14 Fracture 3228.00 3282.50 0
2011-03-15 Perforation 3203.50 3204.50 6
2011-03-15 Perforation 3182.00 3183.00 6
2011-03-15 Perforation 3154.00 3155.00 6
2011-03-15 Perforation 3123.00 3124.00 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6315 0.0 0.0 0.0
2012 8623 0.0 0.0 0.0
2013 8032 0.0 0.0 0.0
2014 6635 0.0 0.0 0.0
2015 6976 0.0 0.0 0.0
2016 8241 0.0 0.0 0.0
2017 7131 0.0 0.0 0.0
2018 8423 0.0 0.0 0.0
2019 7828 0.0 0.0 0.0
2020 341 0.0 0.0 0.0

For data sources see[5]

References