X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575220402003

Well Details

Well ID: 0575220402003
Loading map...
Location: 00/02-04-057-22W5/3
Location Alias: 00/02-04-57-22 W5M
Location Alias 2: 00/02-04-057-22 W5/03
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 22
Section: 04
County/Municipality: Yellowhead County
Well Name: ACL WILD RIV 2-4-57-22
Operator Name: Paramount Resources Ltd.
License Number: 0397636
License Date: 2008-06-17
License Status: Issued
Spud Date: 2008-08-17
Final Drill Date: 2008-09-18
Well Total Depth: 3040.00 m
Surface Hole Latitude: 53.894384
Surface Hole Longitude: -117.212433

For data sources see[1][2]

Well History

Date Event
2008-06-17 Obtained License
2008-08-20 Surface Casing Operation Performed
2008-09-06 Direction Drilling Operation Performed - Deviate
2008-09-18 Finished Drilling
2008-09-18 Well Log Performed
2008-09-18 Well Mode changed to Drilled and Cased
2008-09-19 Production Casing Operation Performed
2008-09-19 Rig Released
2008-09-24 Well Log Performed
2008-09-29 Well Log Performed
2008-09-30 Perforation Treatment Performed - Jet Perforation
2008-10-01 Perforation Treatment Performed - Fractured
2008-10-01 Well Log Performed
2008-10-02 Perforation Treatment Performed - Jet Perforation
2008-10-03 Perforation Treatment Performed - Fractured
2008-10-03 Well Log Performed
2008-10-04 Perforation Treatment Performed - Jet Perforation
2008-10-05 Perforation Treatment Performed - Fractured
2008-10-05 Well Log Performed
2008-10-06 Perforation Treatment Performed - Jet Perforation
2008-10-07 Perforation Treatment Performed - Fractured
2008-10-07 Well Log Performed
2008-10-30 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-09-06 670.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-30 Perforation 2989.10 2995.00 6
2008-10-04 Perforation 2816.20 2818.80 6
2008-10-04 Perforation 2837.70 2837.80 3
2008-10-05 Fracture 2717.00 2837.80 0
2008-10-06 Perforation 2521.50 2523.50 7
2008-10-07 Fracture 2521.50 2523.50 0
2008-09-30 Perforation 3006.60 3010.70 6
2008-09-30 Perforation 3019.40 3019.50 3
2008-10-01 Fracture 2989.10 3019.50 0
2008-10-02 Perforation 2891.40 2927.70 6
2008-10-02 Perforation 2930.00 2973.70 6
2008-10-03 Fracture 2891.40 2973.70 0
2008-10-04 Perforation 2717.00 2723.00 6
2008-10-04 Perforation 2753.20 2787.60 6

For data sources see[5]



References