X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575203410002

Well Details

Well ID: 0575203410002
Loading map...
Location: 00/10-34-057-20W5/2
Location Alias: 00/10-34-57-20 W5M
Location Alias 2: 00/10-34-057-20 W5/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 20
Section: 34
County/Municipality: Yellowhead County
Well Name: ACL PINE CK 10-34-57-20
Operator Name: Paramount Resources Ltd.
License Number: 0056862
License Date: 1976-01-30
License Status: Suspension
Spud Date: 1976-02-14
Final Drill Date: 1976-03-27
Well Total Depth: 2652.10 m
Surface Hole Latitude: 53.972937
Surface Hole Longitude: -116.882805

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-01-30 Obtained License
1976-03-03 Well Log Performed
1976-03-27 Finished Drilling
1976-03-27 Well Mode changed to Drilled and Cased
1976-03-30 Drill Stem Test Performed
1976-03-31 Drill Stem Test Performed
1976-04-02 Production Casing Operation Performed
1977-03-01 Well Log Performed
1977-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-04 Perforation Treatment Performed - Jet Perforation
1977-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-12 Perforation Treatment Performed - Jet Perforation
1977-03-14 Perforation Treatment Performed - Jet Perforation
1977-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-03-23 Perforation Treatment Performed - Jet Perforation
1977-03-26 Perforation Treatment Performed - Cement Squeeze
1977-03-28 Perforation Treatment Performed - Jet Perforation
1977-03-28 Well Log Performed
1977-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-31 Perforation Treatment Performed - Jet Perforation
1977-03-31 Well Log Performed
1977-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-10 Perforation Treatment Performed - Jet Perforation
1987-06-11 Perforation Treatment Performed - Cement Squeeze
1987-06-11 Perforation Treatment Performed - Jet Perforation
1987-06-11 Plug Back Performed
1987-06-17 Perforation Treatment Performed - Jet Perforation
1987-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-05 Well Began Production
1988-03-05 Well Fluid changed to Gas
1988-03-05 Well Mode changed to Flowing
1990-02-14 Well Fluid changed to Gas
1990-02-14 Well Mode changed to Suspended
1991-06-01 Well Fluid changed to Gas
1991-06-01 Well Mode changed to Flowing
2006-02-22 Perforation Treatment Performed - Jet Perforation
2006-02-22 Well Log Performed
2006-03-01 Perforation Treatment Performed - Fractured
2006-05-02 Well Fluid changed to Gas
2006-05-02 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-03-04 Perforation 2559.40 2563.40 7
1977-03-28 Perforation 1958.60 1976.90 7
1977-03-28 Perforation 1980.60 1995.50 7
1977-03-30 Acid Treatment 1958.60 1995.50 0
1977-03-31 Perforation 1931.80 1941.00 7
1977-03-31 Perforation 1942.80 1950.70 7
1977-04-01 Packing Device Capped w/Cement 1956.80 1956.80 0
1977-04-01 Acid Treatment 1931.80 1950.70 0
1987-06-09 Acid Treatment 1931.80 1950.70 0
1987-06-10 Perforation 1958.60 1976.90 7
1987-06-11 Perforation 1980.60 1995.50 7
1977-03-04 Acid Treatment 2559.40 2563.40 0
1987-06-11 Cement Squeeze 1958.60 1995.50 0
1987-06-17 Perforation 2526.80 2543.30 7
1987-06-17 Perforation 2546.90 2548.70 7
1987-06-17 Perforation 2559.40 2563.40 7
1987-06-23 Acid Treatment 2526.80 2548.70 0
1987-06-29 Acid Treatment 2526.80 2548.70 0
2006-02-22 Perforation 2460.00 2463.00 17
2006-03-01 Fracture 2460.00 2463.00 0
1977-03-12 Perforation 2546.90 2548.70 7
1977-03-12 Acid Treatment 2546.90 2548.70 0
1977-03-14 Perforation 2526.80 2543.30 7
1977-03-15 Acid Treatment 2526.80 2543.30 0
1977-03-21 Packing Device Capped w/Cement 2488.10 2499.40 0
1977-03-23 Perforation 2457.30 2464.00 7
1977-03-26 Cement Squeeze 2457.30 2464.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4389 0.0 0.0 0.0
1989 3731 0.0 0.0 0.0
1991 1246 0.0 0.0 0.0
1993 3283 0.0 0.0 0.0
1994 4765 0.0 0.0 0.0
1995 1024 0.0 0.0 0.0
1996 3637 0.0 0.0 0.0
1997 7381 0.0 0.0 0.0
1998 6126 0.0 0.0 0.0
1999 2839 0.0 0.0 0.0
2000 6464 0.0 0.0 0.0
2001 5370 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8711 0.0 0.0 0.0
2006 744 0.0 0.0 0.0

For data sources see[5]

References