X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575202011000

Well Details

Well ID: 0575202011000
Loading map...
Location: 00/11-20-057-20W5/0
Location Alias: 00/11-20-57-20 W5M
Location Alias 2: 00/11-20-057-20 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 20
Section: 20
County/Municipality: Yellowhead County
Well Name: ACL FIR 11-20-57-20
Operator Name: Paramount Resources Ltd.
License Number: 0049202
License Date: 1974-02-28
License Status: Issued
Spud Date: 1974-03-05
Final Drill Date: 1974-03-26
Well Total Depth: 2703.60 m
Surface Hole Latitude: 53.941544
Surface Hole Longitude: -116.937782

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-02-28 Obtained License
1974-03-06 Lost Circulation Occurred
1974-03-26 Finished Drilling
1974-03-29 Production Casing Operation Performed
1974-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-31 Perforation Treatment Performed - Jet Perforation
1974-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-04-05 Well Mode changed to Drilled and Cased
1988-03-05 Well Log Performed
1988-03-09 Perforation Treatment Performed - Jet Perforation
1988-03-11 Perforation Treatment Performed - Remedial Casing
1988-03-11 Well Log Performed
1997-12-18 Well Log Performed
1997-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-20 Plug Back Performed
1997-12-20 Well Mode changed to Abandoned Zone
1997-12-22 Perforation Treatment Performed - Jet Perforation
1998-01-07 Perforation Treatment Performed - Fractured
1998-03-18 Perforation Treatment Performed - Jet Perforation
2000-11-20 Perforation Treatment Performed - Jet Perforation
2000-11-23 Perforation Treatment Performed - Fractured
2000-11-28 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-03-31 Perforation 2619.50 2622.80 7
2000-11-20 Perforation 2204.30 2206.80 34
2000-11-23 Fracture 2204.30 2206.80 0
2000-11-28 Chemical Squeeze 2204.30 2206.80 0
1974-03-31 Acid Treatment 2619.50 2622.80 0
1974-04-01 Acid Treatment 2619.50 2622.80 0
1988-03-09 Perforation 1510.00 1510.60 7
1988-03-11 Remedial Casing Cementing 1510.00 1510.60 0
1997-12-20 Packing Device Capped w/Cement 2578.00 2586.00 0
1997-12-22 Perforation 2516.50 2519.50 17
1998-01-07 Fracture 2516.50 2519.50 0
1998-03-18 Perforation 2516.50 2519.50 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1974-03-06 Lost Circulation 148.40 148.40

For data sources see[5]

References