X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575202001000

Well Details

Well ID: 0575202001000
Loading map...
Location: 00/01-20-057-20W5/0
Location Alias: 00/01-20-57-20 W5M
Location Alias 2: 00/01-20-057-20 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 20
Section: 20
County/Municipality: Yellowhead County
Well Name: DAYLIGHT HZ FIR 1-20-57-20
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0419089
License Date: 2010-03-05
License Status: Suspension
Spud Date: 2010-03-16
Final Drill Date: 2010-04-08
Well Total Depth: 3046.00 m
Surface Hole Latitude: 53.947916
Surface Hole Longitude: -116.929848

For data sources see[1][2]

Well History

Date Event
2010-03-05 Obtained License
2010-03-19 Surface Casing Operation Performed
2010-03-22 Direction Drilling Operation Performed - Horizontal
2010-03-26 Well Log Performed
2010-03-28 Intermediate Casing Operation Performed
2010-04-08 Finished Drilling
2010-04-08 Well Log Performed
2010-04-08 Well Mode changed to Drilled and Cased
2010-04-09 Well Log Performed
2010-04-11 Liner Casing Operation Performed
2010-04-11 Rig Released
2010-04-28 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-28 Perforation Treatment Performed - Open-Hole Completion
2010-07-01 Well Fluid changed to Gas
2010-07-01 Well Mode changed to Testing
2010-09-01 Well Began Production
2010-09-01 Well Fluid changed to Crude Oil
2010-09-01 Well Mode changed to Pumping
2014-09-01 Well Fluid changed to Crude Oil
2014-09-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-22 1561.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-04-28 Open Hole/Barefoot Completion 3042.00 3046.00 0
2010-04-28 Multi-Stage Fracture 2269.90 2270.00 0
2010-04-28 Multi-Stage Fracture 2185.10 2185.20 0
2010-04-28 Multi-Stage Fracture 2125.00 2125.10 0
2010-04-28 Multi-Stage Fracture 1994.60 1994.70 0
2010-04-28 Multi-Stage Fracture 3006.20 3006.30 0
2010-04-28 Multi-Stage Fracture 2941.10 2941.20 0
2010-04-28 Multi-Stage Fracture 2855.90 2856.00 0
2010-04-28 Multi-Stage Fracture 2757.60 2757.70 0
2010-04-28 Multi-Stage Fracture 2698.90 2699.00 0
2010-04-28 Multi-Stage Fracture 2461.60 2641.70 0
2010-04-28 Multi-Stage Fracture 2543.50 2543.60 0
2010-04-28 Multi-Stage Fracture 2339.80 2339.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3379 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 4423 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-04-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References