X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575201205000

Well Details

Well ID: 0575201205000
Loading map...
Location: 00/05-12-057-20W5/0
Location Alias: 00/05-12-57-20 W5M
Location Alias 2: 00/05-12-057-20 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 20
Section: 12
County/Municipality: Yellowhead County
Well Name: ACL ET AL HZ PINE CK 5-12-57-20
Operator Name: Paramount Resources Ltd.
License Number: 0434093
License Date: 2011-06-06
License Status: Issued
Spud Date: 2011-07-20
Final Drill Date: 2011-08-19
Well Total Depth: 3957.00 m
Surface Hole Latitude: 53.906423
Surface Hole Longitude: -116.826892

For data sources see[1][2]

Well History

Date Event
2011-06-06 Obtained License
2011-07-23 Surface Casing Operation Performed
2011-07-27 Direction Drilling Operation Performed - Deviate
2011-07-27 Well Log Performed
2011-08-07 Well Log Performed
2011-08-08 Intermediate Casing Operation Performed
2011-08-12 Direction Drilling Operation Performed - Horizontal
2011-08-16 Well Log Performed
2011-08-19 Finished Drilling
2011-08-19 Well Log Performed
2011-08-19 Well Mode changed to Drilled and Cased
2011-08-20 Well Log Performed
2011-08-22 Liner Casing Operation Performed
2011-08-22 Perforation Treatment Performed - Open-Hole Completion
2011-08-26 Rig Released
2011-09-05 Perforation Treatment Performed - Jet Perforation
2011-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-25 Well Log Performed
2011-10-31 Well Began Production
2011-10-31 Well Fluid changed to Gas
2011-10-31 Well Mode changed to Flowing
2019-09-04 Well Fluid changed to Gas
2019-09-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-27 708.00 Deviate (5 - 79 degrees)
2011-08-12 2725.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-22 Open Hole/Barefoot Completion 3753.30 3957.00 0
2011-09-05 Multi-Stage Fracture 3189.80 3189.90 0
2011-09-05 Multi-Stage Fracture 3294.00 3294.10 0
2011-09-05 Multi-Stage Fracture 3398.00 3398.10 0
2011-09-05 Multi-Stage Fracture 3501.00 3501.10 0
2011-09-05 Multi-Stage Fracture 3603.70 3603.80 0
2011-09-05 Multi-Stage Fracture 3747.80 3747.90 0
2011-09-05 Multi-Stage Fracture 2203.10 2203.20 0
2011-09-05 Perforation 2406.00 2409.00 20
2011-09-05 Multi-Stage Fracture 2560.00 2560.10 0
2011-09-05 Multi-Stage Fracture 2662.40 2662.50 0
2011-09-05 Multi-Stage Fracture 2765.50 2765.60 0
2011-09-05 Multi-Stage Fracture 2867.90 2868.00 0
2011-09-05 Multi-Stage Fracture 2970.70 2970.80 0
2011-09-05 Multi-Stage Fracture 3073.60 3073.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1256 0.0 0.0 0.0
2012 7604 0.0 0.0 0.0
2013 7528 0.0 0.0 0.0
2014 8278 0.0 0.0 0.0
2015 8525 0.0 0.0 0.0
2016 8379 0.0 0.0 0.0
2017 8461 0.0 0.0 0.0
2018 8543 0.0 0.0 0.0
2019 6113 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References