X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575201203000

Well Details

Well ID: 0575201203000
Loading map...
Location: 00/03-12-057-20W5/0
Location Alias: 00/03-12-57-20 W5M
Location Alias 2: 00/03-12-057-20 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 20
Section: 12
County/Municipality: Yellowhead County
Well Name: ACL ET AL HZ PINE CK 3-12-57-20
Operator Name: Paramount Resources Ltd.
License Number: 0470129
License Date: 2014-09-22
License Status: Amended
Spud Date: 2014-11-21
Final Drill Date: 2015-01-01
Well Total Depth: 4761.00 m
Surface Hole Latitude: 53.904109
Surface Hole Longitude: -116.868646

For data sources see[1][2]

Well History

Date Event
2014-09-22 Obtained License
2014-11-23 Surface Casing Operation Performed
2014-11-28 Direction Drilling Operation Performed - Deviate
2014-12-02 Well Log Performed
2014-12-05 Intermediate Casing Operation Performed
2014-12-08 Direction Drilling Operation Performed - Deviate
2014-12-09 Direction Drilling Operation Performed - Horizontal
2015-01-01 Finished Drilling
2015-01-01 Well Log Performed
2015-01-01 Well Mode changed to Drilled and Cased
2015-01-04 Liner Casing Operation Performed
2015-01-04 Perforation Treatment Performed - Open-Hole Completion
2015-01-07 Rig Released
2015-07-28 Well Log Performed
2015-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-03 Well Fluid changed to Gas
2015-08-03 Well Mode changed to Testing
2015-08-11 Well Fluid changed to Gas
2015-08-11 Well Mode changed to Test Completed
2015-10-08 Well Began Production
2015-10-08 Well Fluid changed to Gas
2015-10-08 Well Mode changed to Flowing
2016-11-20 Well Fluid changed to Gas
2016-11-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-11-28 2409.00 Deviate (5 - 79 degrees)
2014-12-08 2926.00 Deviate (5 - 79 degrees)
2014-12-09 2973.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-04 Open Hole/Barefoot Completion 4745.00 4761.00 0
2015-08-03 Multi-Stage Fracture 3895.70 3895.80 0
2015-08-03 Hydra Jet Perforation 3787.40 3787.50 0
2015-08-03 Multi-Stage Fracture 3665.20 3665.30 0
2015-08-03 Multi-Stage Fracture 3529.80 3529.90 0
2015-08-03 Multi-Stage Fracture 3448.00 3448.10 0
2015-08-03 Multi-Stage Fracture 3339.40 3339.50 0
2015-08-03 Multi-Stage Fracture 3230.80 3230.90 0
2015-08-03 Multi-Stage Fracture 3108.80 3108.90 0
2015-08-02 Multi-Stage Fracture 4740.00 4740.10 0
2015-08-02 Multi-Stage Fracture 4654.30 4654.40 0
2015-08-02 Multi-Stage Fracture 4572.70 4572.80 0
2015-08-02 Multi-Stage Fracture 4411.20 4411.30 0
2015-08-02 Multi-Stage Fracture 4329.70 4329.80 0
2015-08-02 Multi-Stage Fracture 4234.80 4234.90 0
2015-08-03 Multi-Stage Fracture 4099.50 4099.60 0
2015-08-03 Hydra Jet Perforation 3990.90 3991.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-02 2015-08-03 2,780 820 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 40.2194 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 20.0021 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 0.7418 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0391 N/A
Methanol 67-56-1 100 0.0391 N/A
Water 7732-18-5 100 0.0391 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0092 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.0917 N/A
D-3 Baker Hughes Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0322 N/A
Isopropanol 67-63-0 100 0.0322 N/A
Methanol 67-56-1 100 0.0322 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 38.3121 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.1781 N/A
Oxyalkylated alcohol 9014 100 0.1781 N/A
Petroleum distillates 64742-47-8 100 0.178 N/A
Polyacrylate 9014 100 0.178 N/A
Flo-Back 30 Baker Hughes Surfactant Cocamido propyl betaine 61789-40-0 100 0.3739 N/A
Non-hazardous Not Available 100 0.3739 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-21 2015-07-29 Groundwater - Non-saline less than or equal to 150m deep 1025

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2125 0.0 0.0 0.0
2016 7176 0.0 0.0 0.0
2017 3066 0.0 0.0 0.0
2018 134 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-07 No Incident Encountered 0.00 0.00
2015-08-30 No Incident Encountered 0.00 0.00

For data sources see[9]

References