X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575201004000

Well Details

Well ID: 0575201004000
Loading map...
Location: 00/04-10-057-20W5/0
Location Alias: 00/04-10-57-20 W5M
Location Alias 2: 00/04-10-057-20 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 20
Section: 10
County/Municipality: Yellowhead County
Well Name: ACL ET AL HZ PINE CK 4-10-57-20
Operator Name: Paramount Resources Ltd.
License Number: 0468148
License Date: 2014-07-16
License Status: Issued
Spud Date: 2014-09-11
Final Drill Date: 2014-10-06
Well Total Depth: 3971.00 m
Surface Hole Latitude: 53.922723
Surface Hole Longitude: -116.899024

For data sources see[1][2]

Well History

Date Event
2014-07-16 Obtained License
2014-09-11 Lost Circulation Occurred
2014-09-11 Well Log Performed
2014-09-13 Surface Casing Operation Performed
2014-09-17 Direction Drilling Operation Performed - Deviate
2014-09-20 Direction Drilling Operation Performed - Horizontal
2014-09-20 Well Log Performed
2014-09-21 Lost Circulation Occurred
2014-09-25 Intermediate Casing Operation Performed
2014-10-06 Finished Drilling
2014-10-06 Perforation Treatment Performed - Jet Perforation
2014-10-06 Perforation Treatment Performed - Remedial Casing
2014-10-06 Well Log Performed
2014-10-06 Well Mode changed to Drilled and Cased
2014-10-11 Liner Casing Operation Performed
2014-10-11 Perforation Treatment Performed - Open-Hole Completion
2014-10-13 Rig Released
2014-10-22 Well Log Performed
2014-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-27 Well Fluid changed to Gas
2014-10-27 Well Mode changed to Testing
2014-11-03 Well Fluid changed to Gas
2014-11-03 Well Mode changed to Test Completed
2014-11-26 Well Began Production
2014-11-26 Well Fluid changed to Gas
2014-11-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-11 Savanna Drilling Corp. 615 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-09-17 1999.00 Deviate (5 - 79 degrees)
2014-09-20 2813.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-06 Perforation 2122.00 2123.00 17
2014-10-25 Multi-Stage Fracture 3446.10 3446.20 0
2014-10-25 Multi-Stage Fracture 3324.30 3324.40 0
2014-10-25 Multi-Stage Fracture 3216.00 3216.10 0
2014-10-25 Multi-Stage Fracture 3107.60 3107.70 0
2014-10-25 Multi-Stage Fracture 2999.20 2999.30 0
2014-10-25 Multi-Stage Fracture 2877.20 2877.30 0
2014-10-06 Remedial Casing Cementing 2122.00 2123.00 0
2014-10-11 Open Hole/Barefoot Completion 3945.00 3971.00 0
2014-10-24 Multi-Stage Fracture 3940.30 3940.40 0
2014-10-24 Multi-Stage Fracture 3854.50 3854.60 0
2014-10-25 Multi-Stage Fracture 3799.70 3799.80 0
2014-10-25 Multi-Stage Fracture 3744.70 3744.80 0
2014-10-25 Multi-Stage Fracture 3636.20 3636.30 0
2014-10-25 Multi-Stage Fracture 3527.70 3527.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-24 2014-10-25 2,572 1,214 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 42.6707 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 21.0627 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 0.3564 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0403 N/A
Methanol 67-56-1 100 0.0403 N/A
Water 7732-18-5 100 0.0403 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0042 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.0939 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 35.4029 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.1716 N/A
Oxyalkylated alcohol 9014 100 0.1716 N/A
Petroleum distillates 64742-47-8 100 0.1716 N/A
Polyacrylate 9014 100 0.1716 N/A
FAW-26 Baker Hughes Surfactant 1-Butoxy-2-propanol 5131-66-8 100 0.1969 N/A
Diethanolamine 111-42-2 100 0.197 N/A
Ethanol 64-17-5 100 0.1969 N/A
Methanol 67-56-1 100 0.1969 N/A
Polyoxyalkylene sulfate 68891-29-2 100 0.1969 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-10-19 2014-10-22 Surface Water - River 409
2014-10-18 2014-10-20 Surface Water - Runoff 471
2014-10-19 2014-10-22 Groundwater - Non-saline less than or equal to 150m deep 104
2014-10-22 2014-10-25 Surface Water - Lake 93

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 863 0.0 0.0 0.0
2015 8357 0.0 0.0 0.0
2016 8032 0.0 0.0 0.0
2017 8626 0.0 0.0 0.0
2018 8631 0.0 0.0 0.0
2019 8172 0.0 0.0 0.0
2020 1483 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-11 Lost Circulation 95.00 95.00
2014-09-21 Lost Circulation 1852.00 1852.00
2014-11-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References