0575193411000

Well Details

Well ID: 0575193411000
Loading map...
Location: 00/11-34-057-19W5/0
Location Alias: 00/11-34-57-19 W5M
Location Alias 2: 00/11-34-057-19 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 19
Section: 34
County/Municipality: Yellowhead County
Well Name: ACL PINE CK 11-34-57-19
Operator Name: Paramount Resources Ltd.
License Number: 0013206
License Date: 1957-03-14
License Status: Abandoned
Spud Date: 1957-03-21
Final Drill Date: 1957-07-07
Well Total Depth: 3514.30 m
Surface Hole Latitude: 53.972009
Surface Hole Longitude: -116.741821

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-03-14 Obtained License
1957-04-04 Drill Stem Test Performed
1957-04-05 Drill Stem Test Performed
1957-04-11 Production Casing Operation Performed
1957-06-05 Drill Stem Test Performed
1957-06-14 Drill Stem Test Performed
1957-06-21 Drill Stem Test Performed
1957-06-23 Drill Stem Test Performed
1957-06-28 Drill Stem Test Performed
1957-06-30 Drill Stem Test Performed
1957-07-02 Drill Stem Test Performed
1957-07-04 Drill Stem Test Performed
1957-07-07 Drill Stem Test Performed
1957-07-07 Finished Drilling
1957-07-14 Perforation Treatment Performed - Jet Perforation
1958-01-24 Well Mode changed to Drilled and Cased
1962-06-08 Well Began Production
1962-06-08 Well Fluid changed to Gas
1962-06-08 Well Mode changed to Flowing
1963-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-25 Perforation Treatment Performed - Nitrogen Treatment
1963-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-14 Perforation Treatment Performed - Cement Plug
1964-10-14 Well Fluid changed to Gas
1964-10-14 Well Mode changed to Abandoned Zone
1964-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-17 Perforation Treatment Performed - Jet Perforation
1964-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-10-21 Perforation Treatment Performed - Jet Perforation
1964-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-18 Perforation Treatment Performed - Nitrogen Treatment
1966-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-16 Plug Back Performed
1996-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-20 Well Log Performed
1996-10-22 Perforation Treatment Performed - Cement Plug
1996-10-23 Perforation Treatment Performed - Jet Perforation
1996-10-23 Perforation Treatment Performed - Remedial Casing
1996-10-23 Well Log Performed
1996-10-24 Perforation Treatment Performed - Cement Plug
1996-10-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-07-14 Perforation 3462.50 3464.40 13
1964-10-17 Perforation 3182.10 3184.60 7
1964-10-17 Acid Treatment 3182.10 3184.60 0
1964-10-18 Packing Device Capped w/Cement 3172.40 3172.40 0
1964-10-21 Perforation 3133.30 3144.60 7
1964-10-21 Perforation 3153.50 3156.50 7
1964-10-22 Acid Treatment 3133.30 3156.50 0
1964-10-30 Acid Treatment 3133.30 3156.50 0
1964-11-18 Nitrogen Treatment 3133.30 3156.50 0
1964-11-18 Acid Treatment 3133.30 3156.50 0
1966-09-30 Acid Treatment 3133.30 3156.50 0
1957-07-14 Perforation 3465.60 3467.40 13
1996-10-16 Packing Device Capped w/Cement 3108.60 3116.60 0
1996-10-20 Packing Device Capped w/Cement 3073.00 3081.00 0
1996-10-20 Packing Device Capped w/Cement 1082.00 1090.00 0
1996-10-22 Cement Plug 765.00 795.00 0
1996-10-23 Perforation 600.00 601.00 14
1996-10-23 Remedial Casing Cementing 600.00 601.00 0
1996-10-24 Cement Plug 564.00 601.00 0
1957-07-14 Perforation 3473.50 3475.30 13
1957-07-14 Perforation 3475.90 3477.80 13
1957-07-14 Perforation 3468.30 3472.30 13
1963-01-25 Acid Treatment 3462.50 3477.80 0
1963-01-25 Nitrogen Treatment 3462.50 3477.80 0
1963-02-16 Acid Treatment 3462.50 3477.80 0
1964-10-14 Cement Plug 3186.40 3229.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0

For data sources see[5]

References