If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0575191716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.917456,"lon":-116.798929,"icon":""}]} |
Location: 00/16-17-057-19W5/0 | |
Location Alias: 00/16-17-57-19 W5M | |
Location Alias 2: 00/16-17-057-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 5 | |
Range: 19 | |
Section: 17 | |
County/Municipality: Yellowhead County | |
Well Name: ACL ET AL HZ PINE CK 16-17-57-19 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0443412 | |
License Date: 2012-01-26 | |
License Status: Issued | |
Spud Date: 2012-02-22 | |
Final Drill Date: 2012-03-19 | |
Well Total Depth: 4716.00 m | |
Surface Hole Latitude: 53.917456 | |
Surface Hole Longitude: -116.798929 |
Date | Event |
---|---|
2012-01-26 | Obtained License |
2012-02-25 | Surface Casing Operation Performed |
2012-02-29 | Direction Drilling Operation Performed - Deviate |
2012-03-06 | Intermediate Casing Operation Performed |
2012-03-07 | Direction Drilling Operation Performed - Horizontal |
2012-03-07 | Well Log Performed |
2012-03-19 | Finished Drilling |
2012-03-19 | Well Log Performed |
2012-03-19 | Well Mode changed to Drilled and Cased |
2012-03-22 | Liner Casing Operation Performed |
2012-03-22 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-22 | Rig Released |
2012-08-10 | Well Log Performed |
2012-08-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-26 | Well Fluid changed to Gas |
2012-08-26 | Well Mode changed to Testing |
2012-08-28 | Well Fluid changed to Gas |
2012-08-28 | Well Mode changed to Test Completed |
2012-10-25 | Well Began Production |
2012-10-25 | Well Fluid changed to Gas |
2012-10-25 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-22 | Savanna Drilling Corp. | 634 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-29 | 2140.00 | Deviate (5 - 79 degrees) |
2012-03-07 | 2756.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-22 | Open Hole/Barefoot Completion | 4711.00 | 4716.00 | 0 |
2012-08-23 | Multi-Stage Fracture | 2829.30 | 2829.40 | 0 |
2012-08-23 | Multi-Stage Fracture | 2900.40 | 2900.50 | 0 |
2012-08-23 | Multi-Stage Fracture | 3031.70 | 3031.80 | 0 |
2012-08-23 | Multi-Stage Fracture | 3176.40 | 3176.50 | 0 |
2012-08-23 | Multi-Stage Fracture | 3344.80 | 3344.90 | 0 |
2012-08-23 | Multi-Stage Fracture | 3501.90 | 3502.00 | 0 |
2012-08-17 | Multi-Stage Fracture | 3957.70 | 3957.80 | 0 |
2012-08-17 | Multi-Stage Fracture | 4118.20 | 4118.30 | 0 |
2012-08-17 | Multi-Stage Fracture | 4277.00 | 4277.10 | 0 |
2012-08-17 | Multi-Stage Fracture | 4436.70 | 4436.80 | 0 |
2012-08-17 | Multi-Stage Fracture | 4581.50 | 4581.60 | 0 |
2012-08-17 | Multi-Stage Fracture | 4701.70 | 4701.80 | 0 |
2012-08-22 | Multi-Stage Fracture | 3657.70 | 3657.80 | 0 |
2012-08-22 | Multi-Stage Fracture | 3813.20 | 3813.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1559 | 0.0 | 0.0 | 0.0 |
2013 | 7595 | 0.0 | 0.0 | 0.0 |
2014 | 7196 | 0.0 | 0.0 | 0.0 |
2015 | 6445 | 0.0 | 0.0 | 0.0 |
2016 | 7077 | 0.0 | 0.0 | 0.0 |
2017 | 8639 | 0.0 | 0.0 | 0.0 |
2018 | 8689 | 0.0 | 0.0 | 0.0 |
2019 | 6854 | 0.0 | 0.0 | 0.0 |
2020 | 896 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]