X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575191716000

Well Details

Well ID: 0575191716000
Loading map...
Location: 00/16-17-057-19W5/0
Location Alias: 00/16-17-57-19 W5M
Location Alias 2: 00/16-17-057-19 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 19
Section: 17
County/Municipality: Yellowhead County
Well Name: ACL ET AL HZ PINE CK 16-17-57-19
Operator Name: Paramount Resources Ltd.
License Number: 0443412
License Date: 2012-01-26
License Status: Issued
Spud Date: 2012-02-22
Final Drill Date: 2012-03-19
Well Total Depth: 4716.00 m
Surface Hole Latitude: 53.917456
Surface Hole Longitude: -116.798929

For data sources see[1][2]

Well History

Date Event
2012-01-26 Obtained License
2012-02-25 Surface Casing Operation Performed
2012-02-29 Direction Drilling Operation Performed - Deviate
2012-03-06 Intermediate Casing Operation Performed
2012-03-07 Direction Drilling Operation Performed - Horizontal
2012-03-07 Well Log Performed
2012-03-19 Finished Drilling
2012-03-19 Well Log Performed
2012-03-19 Well Mode changed to Drilled and Cased
2012-03-22 Liner Casing Operation Performed
2012-03-22 Perforation Treatment Performed - Open-Hole Completion
2012-03-22 Rig Released
2012-08-10 Well Log Performed
2012-08-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-26 Well Fluid changed to Gas
2012-08-26 Well Mode changed to Testing
2012-08-28 Well Fluid changed to Gas
2012-08-28 Well Mode changed to Test Completed
2012-10-25 Well Began Production
2012-10-25 Well Fluid changed to Gas
2012-10-25 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-22 Savanna Drilling Corp. 634 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-29 2140.00 Deviate (5 - 79 degrees)
2012-03-07 2756.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-22 Open Hole/Barefoot Completion 4711.00 4716.00 0
2012-08-23 Multi-Stage Fracture 2829.30 2829.40 0
2012-08-23 Multi-Stage Fracture 2900.40 2900.50 0
2012-08-23 Multi-Stage Fracture 3031.70 3031.80 0
2012-08-23 Multi-Stage Fracture 3176.40 3176.50 0
2012-08-23 Multi-Stage Fracture 3344.80 3344.90 0
2012-08-23 Multi-Stage Fracture 3501.90 3502.00 0
2012-08-17 Multi-Stage Fracture 3957.70 3957.80 0
2012-08-17 Multi-Stage Fracture 4118.20 4118.30 0
2012-08-17 Multi-Stage Fracture 4277.00 4277.10 0
2012-08-17 Multi-Stage Fracture 4436.70 4436.80 0
2012-08-17 Multi-Stage Fracture 4581.50 4581.60 0
2012-08-17 Multi-Stage Fracture 4701.70 4701.80 0
2012-08-22 Multi-Stage Fracture 3657.70 3657.80 0
2012-08-22 Multi-Stage Fracture 3813.20 3813.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1559 0.0 0.0 0.0
2013 7595 0.0 0.0 0.0
2014 7196 0.0 0.0 0.0
2015 6445 0.0 0.0 0.0
2016 7077 0.0 0.0 0.0
2017 8639 0.0 0.0 0.0
2018 8689 0.0 0.0 0.0
2019 6854 0.0 0.0 0.0
2020 896 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-28 No Incident Encountered 0.00 0.00

For data sources see[8]

References