X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575190616020

Well Details

Well ID: 0575190616020
Loading map...
Location: 02/16-06-057-19W5/0
Location Alias: 02/16-06-57-19 W5M
Location Alias 2: 02/16-06-057-19 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 19
Section: 06
County/Municipality: Yellowhead County
Well Name: SUNCOR PINE CREEK 16-6-57-19
Operator Name: Suncor Energy Inc.
License Number: 0180697
License Date: 1995-09-13
License Status: RecCertified
Spud Date: 1995-10-13
Final Drill Date: 1995-11-06
Well Total Depth: 2865.00 m
Surface Hole Latitude: 53.902214
Surface Hole Longitude: -116.804043

For data sources see[1][2]

Well History

Date Event
1995-09-13 Obtained License
1995-10-13 Lost Circulation Occurred
1995-10-15 Surface Casing Operation Performed
1995-10-25 Direction Drilling Operation Performed - Deviate
1995-10-27 Drill Stem Test Performed
1995-11-06 Finished Drilling
1995-11-06 Well Log Performed
1995-11-08 Well Log Performed
1995-11-10 Well Log Performed
1995-11-11 Production Casing Operation Performed
1995-11-12 Rig Released
1995-11-12 Well Mode changed to Drilled and Cased
1995-11-18 Well Log Performed
1995-12-06 Perforation Treatment Performed - Jet Perforation
1995-12-06 Well Log Performed
1995-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-13 Well Log Performed
1995-12-14 Perforation Treatment Performed - Jet Perforation
1995-12-14 Well Log Performed
1995-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-17 Perforation Treatment Performed - Cement Squeeze
1995-12-21 Perforation Treatment Performed - Jet Perforation
1995-12-21 Well Log Performed
1995-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-18 Perforation Treatment Performed - Jet Perforation
1996-01-18 Well Log Performed
1996-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-19 Perforation Treatment Performed - Cement Squeeze
1996-01-23 Perforation Treatment Performed - Jet Perforation
1996-01-23 Well Log Performed
1996-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-31 Perforation Treatment Performed - Cement Squeeze
1996-02-03 Well Log Performed
1996-02-07 Perforation Treatment Performed - Jet Perforation
1996-02-07 Well Log Performed
1996-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-09 Perforation Treatment Performed - Cement Squeeze
1996-02-10 Perforation Treatment Performed - Jet Perforation
1996-02-10 Well Log Performed
1996-02-11 Perforation Treatment Performed - Cement Squeeze
1996-02-14 Perforation Treatment Performed - Jet Perforation
1996-02-14 Well Log Performed
1996-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-21 Plug Back Performed
1996-02-21 Well Log Performed
1996-02-21 Well Mode changed to Abandoned Zone
1997-10-29 Well Abandoned
1997-10-29 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-10-25 2184.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-12-06 Perforation 2791.50 2797.50 13
1996-01-19 Cement Squeeze 2778.00 2779.50 0
1996-01-23 Perforation 2791.50 2797.50 13
1996-01-26 Acid Treatment 2791.50 2797.50 0
1996-01-31 Cement Squeeze 2791.50 2797.50 0
1996-02-07 Perforation 2298.50 2300.00 39
1996-02-07 Perforation 2266.00 2267.00 39
1996-02-08 Acid Treatment 2266.00 2300.00 0
1996-02-09 Cement Squeeze 2266.00 2300.00 0
1996-02-10 Perforation 2295.00 2296.50 17
1996-02-10 Perforation 2281.50 2286.50 17
1995-12-07 Acid Treatment 2791.50 2797.50 0
1996-02-10 Perforation 2288.50 2290.00 17
1996-02-11 Cement Squeeze 2288.50 2296.50 0
1996-02-14 Perforation 2224.00 2231.60 17
1996-02-14 Perforation 2196.00 2203.00 17
1996-02-14 Perforation 2175.30 2182.90 17
1996-02-15 Acid Treatment 2175.30 2231.60 0
1996-02-18 Acid Treatment 2175.30 2231.60 0
1996-02-21 Packing Device Capped w/Cement 2160.00 2168.00 0
1995-12-14 Perforation 2778.70 2779.00 13
1995-12-17 Acid Treatment 2778.70 2779.00 0
1995-12-17 Cement Squeeze 2778.70 2779.00 0
1995-12-21 Perforation 2791.50 2796.50 13
1995-12-22 Acid Treatment 2791.50 2796.50 0
1996-01-18 Perforation 2778.00 2779.50 40
1996-01-19 Acid Treatment 2778.00 2779.50 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-10-13 Lost Circulation 70.00 70.00

For data sources see[6]

References