X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575190410002

Well Details

Well ID: 0575190410002
Loading map...
Location: 00/10-04-057-19W5/2
Location Alias: 00/10-04-57-19 W5M
Location Alias 2: 00/10-04-057-19 W5/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 19
Section: 04
County/Municipality: Yellowhead County
Well Name: ACL PINE CK 10-4-57-19
Operator Name: Paramount Resources Ltd.
License Number: 0029078
License Date: 1965-10-01
License Status: Issued
Spud Date: 1965-10-20
Final Drill Date: 1965-12-09
Well Total Depth: 3299.50 m
Surface Hole Latitude: 53.899369
Surface Hole Longitude: -116.760500

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-01 Obtained License
1965-10-31 Drill Stem Test Performed
1965-12-07 Drill Stem Test Performed
1965-12-09 Finished Drilling
1965-12-12 Production Casing Operation Performed
1965-12-20 Perforation Treatment Performed - Jet Perforation
1971-02-10 Perforation Treatment Performed - Jet Perforation
1979-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-12 Perforation Treatment Performed - Jet Perforation
1979-08-15 Perforation Treatment Performed - Cement Squeeze
1990-03-26 Well Log Performed
1990-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-27 Plug Back Performed
1990-03-27 Well Log Performed
1990-03-31 Well Log Performed
1990-04-01 Perforation Treatment Performed - Jet Perforation
1990-04-03 Perforation Treatment Performed - Fractured
1990-04-30 Well Mode changed to Drilled and Cased
1990-05-01 Well Began Production
1990-05-01 Well Fluid changed to Gas
1990-05-01 Well Mode changed to Flowing
1999-11-01 Well Fluid changed to Gas
1999-11-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-12-20 Perforation 3261.40 3263.20 13
1990-04-03 Fracture 2618.00 2627.90 0
1965-12-20 Perforation 3265.90 3269.00 13
1971-02-10 Perforation 3272.00 3278.10 13
1979-08-12 Perforation 2752.00 2761.90 7
1979-08-12 Acid Treatment 2752.00 2761.90 0
1979-08-15 Cement Squeeze 2752.00 2761.90 0
1990-03-27 Packing Device Capped w/Cement 3180.00 3188.00 0
1990-03-27 Packing Device Capped w/Cement 2737.00 2745.00 0
1990-04-01 Perforation 2618.00 2627.90 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1756 0.0 0.0 0.0
1992 79 0.0 0.0 0.0
1994 1620 0.0 0.0 0.0
1995 3982 0.0 0.0 0.0
1996 3005 0.0 0.0 0.0
1997 3732 0.0 0.0 0.0
1998 4548 0.0 0.0 0.0
1999 3891 0.0 0.0 0.0
2000 3235 0.0 0.0 0.0
2001 2931 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8423 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8376 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 7727 0.0 0.0 0.0
2011 6848 0.0 0.0 0.0
2012 7357 0.0 0.0 0.0
2013 6984 0.0 0.0 0.0
2014 6588 0.0 0.0 0.0
2015 8345 0.0 0.0 0.0
2016 6321 0.0 0.0 0.0
2017 6284 0.0 0.0 0.0
2018 3646 0.0 0.0 0.0
2019 6892 0.0 0.0 0.0
2020 1199 0.0 0.0 0.0

For data sources see[5]

References