X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575190410000

Well Details

Well ID: 0575190410000
Loading map...
Location: 00/10-04-057-19W5/0
Location Alias: 00/10-04-57-19 W5M
Location Alias 2: 00/10-04-057-19 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 19
Section: 04
County/Municipality: Yellowhead County
Well Name: ACL PINE CK 10-4-57-19
Operator Name: Paramount Resources Ltd.
License Number: 0029078
License Date: 1965-10-01
License Status: Issued
Spud Date: 1965-10-20
Final Drill Date: 1965-12-09
Well Total Depth: 3299.50 m
Surface Hole Latitude: 53.899369
Surface Hole Longitude: -116.760500

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-01 Obtained License
1965-10-31 Drill Stem Test Performed
1965-12-07 Drill Stem Test Performed
1965-12-09 Finished Drilling
1965-12-09 Well Mode changed to Drilled and Cased
1965-12-12 Production Casing Operation Performed
1965-12-20 Perforation Treatment Performed - Jet Perforation
1966-02-03 Well Began Production
1966-02-03 Well Fluid changed to Gas
1966-02-03 Well Mode changed to Flowing
1971-02-10 Perforation Treatment Performed - Jet Perforation
1979-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-12 Perforation Treatment Performed - Jet Perforation
1979-08-15 Perforation Treatment Performed - Cement Squeeze
1990-03-26 Well Log Performed
1990-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-27 Plug Back Performed
1990-03-27 Well Fluid changed to Gas
1990-03-27 Well Log Performed
1990-03-27 Well Mode changed to Abandoned Zone
1990-03-31 Well Log Performed
1990-04-01 Perforation Treatment Performed - Jet Perforation
1990-04-03 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-12-20 Perforation 3261.40 3263.20 13
1990-04-03 Fracture 2618.00 2627.90 0
1965-12-20 Perforation 3265.90 3269.00 13
1971-02-10 Perforation 3272.00 3278.10 13
1979-08-12 Perforation 2752.00 2761.90 7
1979-08-12 Acid Treatment 2752.00 2761.90 0
1979-08-15 Cement Squeeze 2752.00 2761.90 0
1990-03-27 Packing Device Capped w/Cement 3180.00 3188.00 0
1990-03-27 Packing Device Capped w/Cement 2737.00 2745.00 0
1990-04-01 Perforation 2618.00 2627.90 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1396 0.0 0.0 0.0
1969 8371 0.0 0.0 0.0
1970 8088 0.0 0.0 0.0
1971 3366 0.0 0.0 0.0
1972 586 0.0 0.0 0.0
1973 4781 0.0 0.0 0.0
1974 5696 0.0 0.0 0.0
1975 7301 0.0 0.0 0.0
1976 5759 0.0 0.0 0.0
1977 48 0.0 0.0 0.0
1978 899 0.0 0.0 0.0
1979 4 0.0 0.0 0.0

For data sources see[5]

References