X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575091915000

Well Details

Well ID: 0575091915000
Loading map...
Location: 00/15-19-057-09W5/0
Location Alias: 00/15-19-57-09 W5M
Location Alias 2: 00/15-19-057-09 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 09
Section: 19
County/Municipality: Lac Ste. Anne County
Well Name: ELK POINT LEAMAN 15-19-57-9
Operator Name: Obsidian Energy Ltd.
License Number: 0207160
License Date: 1997-10-09
License Status: RecCertified
Spud Date: 1997-10-21
Final Drill Date: 1997-11-05
Well Total Depth: 1845.00 m
Surface Hole Latitude: 53.947798
Surface Hole Longitude: -115.326191

For data sources see[1][2]

Well History

Date Event
1997-10-09 Obtained License
1997-10-22 Surface Casing Operation Performed
1997-10-25 Direction Drilling Operation Performed - Horizontal
1997-11-01 Well Log Performed
1997-11-03 Production Casing Operation Performed
1997-11-05 Finished Drilling
1997-11-05 Perforation Treatment Performed - Open-Hole Completion
1997-11-05 Well Log Performed
1997-11-05 Well Mode changed to Drilled and Cased
1997-11-06 Rig Released
1997-12-01 Well Began Production
1997-12-01 Well Fluid changed to Crude Oil
1997-12-01 Well Log Performed
1997-12-01 Well Mode changed to Pumping
1997-12-04 Well Log Performed
1998-01-31 Well Fluid changed to Crude Oil
1998-01-31 Well Mode changed to Suspended
2003-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-17 Plug Back Performed
2003-12-17 Well Fluid changed to Crude Oil
2003-12-17 Well Mode changed to Abandoned Zone
2003-12-18 Perforation Treatment Performed - Jet Perforation
2003-12-18 Well Log Performed
2003-12-19 Perforation Treatment Performed - Cement Squeeze
2003-12-19 Plug Back Performed
2003-12-29 Perforation Treatment Performed - Cement Squeeze
2003-12-29 Perforation Treatment Performed - Jet Perforation
2003-12-29 Plug Back Performed
2003-12-29 Well Log Performed
2003-12-30 Well Log Performed
2003-12-31 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-10-25 1508.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-05 Open Hole/Barefoot Completion 1760.00 1845.00 0
2003-12-17 Packing Device Capped w/Cement 1650.00 1667.00 0
2003-12-18 Perforation 450.00 451.00 14
2003-12-18 Perforation 400.00 401.00 14
2003-12-19 Cement Squeeze 400.00 401.00 0
2003-12-29 Perforation 281.10 282.10 17
2003-12-29 Cement Squeeze 281.10 282.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 722 0.0 0.0 0.0
1998 561 0.0 0.0 0.0

For data sources see[6]

References