X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575073016032

Well Details

Well ID: 0575073016032
Loading map...
Location: 03/16-30-057-07W5/2
Location Alias: 03/16-30-57-07 W5M
Location Alias 2: 03/16-30-057-07 W5/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 07
Section: 30
County/Municipality: Lac Ste. Anne County
Well Name: BGR ET AL 103 BRIDGE 16-30-57-7
Operator Name: Harvest Operations Corp.
License Number: 0213816
License Date: 1998-02-24
License Status: Abandoned
Spud Date: 1998-03-13
Final Drill Date: 1998-03-17
Well Total Depth: 1372.00 m
Surface Hole Latitude: 53.959054
Surface Hole Longitude: -115.020648

For data sources see[1][2]

Well History

Date Event
1998-02-24 Obtained License
1998-03-14 Surface Casing Operation Performed
1998-03-17 Finished Drilling
1998-03-17 Well Log Performed
1998-03-17 Well Mode changed to Drilled and Cased
1998-03-18 Production Casing Operation Performed
1998-03-18 Rig Released
1998-03-23 Perforation Treatment Performed - Open-Hole Completion
2002-02-12 Well Began Production
2002-02-12 Well Fluid changed to Gas
2002-02-12 Well Mode changed to Flowing
2002-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-10 Plug Back Performed
2002-09-11 Perforation Treatment Performed - Jet Perforation
2002-09-15 Perforation Treatment Performed - Fractured
2003-03-01 Well Fluid changed to Gas
2003-03-01 Well Mode changed to Suspended
2012-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-07 Plug Back Performed
2012-03-07 Well Fluid changed to Gas
2012-03-07 Well Mode changed to Abandoned Zone
2017-11-30 Well Abandoned
2017-11-30 Well Fluid changed to Gas
2017-11-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-23 Open Hole/Barefoot Completion 1360.00 1372.00 0
2002-09-10 Packing Device Capped w/Cement 1337.00 1345.00 0
2002-09-11 Perforation 1159.00 1160.00 14
2002-09-15 Fracture 1159.00 1160.00 0
2012-03-07 Packing Device Capped w/Cement 1147.00 1155.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 24 0.0 0.0 0.0

For data sources see[5]

References