X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575052103002

Well Details

Well ID: 0575052103002
Loading map...
Location: 00/03-21-057-05W5/2
Location Alias: 00/03-21-57-05 W5M
Location Alias 2: 00/03-21-057-05 W5/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 05
Section: 21
County/Municipality: County of Barrhead No. 11
Well Name: CNRL BARRH 3-21-57-5
Operator Name: Canadian Natural Resources Limited
License Number: 0214726
License Date: 1998-04-22
License Status: Suspension
Spud Date: 1998-05-04
Final Drill Date: 1998-05-09
Well Total Depth: 1300.00 m
Surface Hole Latitude: 53.936386
Surface Hole Longitude: -114.687368

For data sources see[1][2]

Well History

Date Event
1998-04-22 Obtained License
1998-05-05 Surface Casing Operation Performed
1998-05-09 Finished Drilling
1998-05-09 Well Log Performed
1998-05-10 Drill Stem Test Performed
1998-05-11 Production Casing Operation Performed
1998-05-11 Rig Released
1998-05-21 Perforation Treatment Performed - Jet Perforation
1998-05-29 Perforation Treatment Performed - Casing Patch (Over Perfs)
1998-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-31 Perforation Treatment Performed - Jet Perforation
1998-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-02 Plug Back Performed
1998-06-03 Perforation Treatment Performed - Jet Perforation
1998-06-03 Well Mode changed to Drilled and Cased
1998-06-06 Perforation Treatment Performed - Fractured
1999-12-03 Well Began Production
1999-12-03 Well Fluid changed to Gas
1999-12-03 Well Mode changed to Flowing
2000-01-11 Well Fluid changed to Gas
2000-01-11 Well Mode changed to Suspended
2000-11-17 Perforation Treatment Performed - Cement Squeeze
2000-11-21 Perforation Treatment Performed - Jet Perforation
2000-11-21 Well Log Performed
2000-11-24 Perforation Treatment Performed - Fractured
2000-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-30 Plug Back Performed
2000-11-30 Well Log Performed
2000-12-01 Perforation Treatment Performed - Jet Perforation
2000-12-01 Well Log Performed
2000-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-01-12 Well Fluid changed to Gas
2001-01-12 Well Mode changed to Flowing
2008-09-01 Well Fluid changed to Gas
2008-09-01 Well Mode changed to Suspended
2011-09-23 Well Fluid changed to Gas
2011-09-23 Well Mode changed to Flowing
2012-08-16 Well Fluid changed to Gas
2012-08-16 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-05-21 Perforation 195.00 195.30 13
2000-11-21 Perforation 1164.00 1169.00 13
2000-11-24 Fracture 1164.00 1169.00 0
2000-11-30 Packing Device Capped w/Cement 1145.00 1155.00 0
2000-12-01 Perforation 540.00 545.00 13
2000-12-02 Acid Treatment 540.00 545.00 0
1998-05-29 Casing Patch 195.00 195.30 0
1998-05-31 Perforation 1278.30 1280.30 20
1998-05-31 Acid Treatment 1278.30 1280.30 0
1998-06-01 Acid Treatment 1278.30 1280.30 0
1998-06-02 Packing Device Capped w/Cement 1260.00 1268.00 0
1998-06-03 Perforation 540.00 545.00 20
1998-06-06 Fracture 540.00 545.00 0
2000-11-17 Cement Squeeze 540.00 545.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 683 0.0 0.0 0.0
2000 240 0.0 0.0 0.0
2001 1081 0.0 0.0 0.0
2011 1595 0.0 0.0 0.0

For data sources see[5]

References