X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575030402003

Well Details

Well ID: 0575030402003
Loading map...
Location: 00/02-04-057-03W5/3
Location Alias: 00/02-04-57-03 W5M
Location Alias 2: 00/02-04-057-03 W5/03
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 03
Section: 04
County/Municipality: Lac Ste. Anne County
Well Name: LONG RUN MAJEAU 2-4-57-3
Operator Name: Long Run Exploration Ltd.
License Number: 0088356
License Date: 1981-01-19
License Status: Suspension
Spud Date: 1981-01-24
Final Drill Date: 1981-01-31
Well Total Depth: 1365.00 m
Surface Hole Latitude: 53.893799
Surface Hole Longitude: -114.380482

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-01-19 Obtained License
1981-01-31 Finished Drilling
1981-01-31 Well Mode changed to Drilled and Cased
1981-02-01 Drill Stem Test Performed
1981-02-02 Drill Stem Test Performed
1981-02-04 Production Casing Operation Performed
1981-03-12 Perforation Treatment Performed - Jet Perforation
1981-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-14 Perforation Treatment Performed - Jet Perforation
1981-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-16 Perforation Treatment Performed - Cement Squeeze
1981-03-17 Perforation Treatment Performed - Jet Perforation
1981-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-11 Perforation Treatment Performed - Chemical Squeeze
1981-11-05 Perforation Treatment Performed - Jet Perforation
1982-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-10 Perforation Treatment Performed - Jet Perforation
1982-06-11 Perforation Treatment Performed - Cement Squeeze
1982-06-12 Perforation Treatment Performed - Jet Perforation
1982-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-14 Perforation Treatment Performed - Jet Perforation
1982-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-16 Perforation Treatment Performed - Jet Perforation
1982-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-30 Well Log Performed
1985-07-01 Perforation Treatment Performed - Jet Perforation
1985-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-06 Well Began Production
1985-07-06 Well Fluid changed to Gas
1985-07-06 Well Mode changed to Flowing
2001-06-01 Perforation Treatment Performed - Chemical Squeeze
2001-06-01 Perforation Treatment Performed - Jet Perforation
2001-06-01 Well Log Performed
2005-07-01 Well Fluid changed to Gas
2005-07-01 Well Mode changed to Pumping
2005-07-18 Perforation Treatment Performed - Casing Patch (Over Perfs)
2007-03-28 Perforation Treatment Performed - Jet Perforation
2007-03-29 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-12 Perforation 1332.50 1333.00 13
1981-07-11 Chemical Squeeze 1328.50 1329.50 0
1981-11-05 Perforation 1182.00 1184.00 7
1982-06-10 Packing Device Capped w/Cement 1226.00 1236.00 0
1982-06-10 Perforation 1192.00 1193.00 5
1982-06-10 Perforation 1175.00 1177.00 5
1982-06-11 Cement Squeeze 1175.00 1193.00 0
1982-06-12 Perforation 1182.00 1183.00 14
1982-06-14 Acid Treatment 1182.00 1183.00 0
1982-06-14 Perforation 1183.00 1184.00 14
1982-06-15 Acid Treatment 1182.00 1184.00 0
1981-03-12 Perforation 1334.50 1335.00 13
1982-06-16 Perforation 1184.00 1184.50 14
1982-06-17 Acid Treatment 1182.00 1184.50 0
1985-07-01 Perforation 1216.00 1218.00 13
1985-07-03 Acid Treatment 1216.00 1218.00 0
2001-06-01 Perforation 1182.00 1184.50 13
2001-06-01 Chemical Squeeze 1182.00 1184.50 0
2001-06-01 Perforation 1216.00 1218.10 13
2005-07-18 Casing Patch 1182.00 1184.50 0
2007-03-28 Perforation 1182.00 1184.50 14
1981-03-12 Perforation 1336.00 1336.50 13
1981-03-13 Acid Treatment 1332.50 1336.50 0
1981-03-14 Perforation 1328.50 1330.50 7
1981-03-15 Acid Treatment 1328.50 1330.50 0
1981-03-16 Cement Squeeze 1328.50 1336.50 0
1981-03-17 Perforation 1328.50 1329.50 7
1981-03-18 Acid Treatment 1328.50 1329.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4157 0.0 0.0 0.0
1986 6207 0.0 0.0 0.0
1987 7229 0.0 0.0 0.0
1988 8438 0.0 0.0 0.0
1989 8715 0.0 0.0 0.0
1990 7375 0.0 0.0 0.0
1991 5370 0.0 0.0 0.0
1992 626 0.0 0.0 0.0
1993 5705 0.0 0.0 0.0
1994 635 0.0 0.0 0.0
1995 5733 0.0 0.0 0.0
1996 7633 0.0 0.0 0.0
1997 8213 0.0 0.0 0.0
1998 8327 0.0 0.0 0.0
1999 8467 0.0 0.0 0.0
2000 8568 0.0 0.0 0.0
2001 8615 0.0 0.0 0.0
2002 8622 0.0 0.0 0.0
2003 8509 0.0 0.0 0.0
2004 8424 0.0 0.0 0.0
2005 8435 0.0 0.0 0.0
2006 8593 0.0 0.0 0.0
2007 2091 0.0 0.0 0.0

For data sources see[5]

References