If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574241709000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.929209,"lon":-113.523439,"icon":""}]} |
Location: 00/09-17-057-24W4/0 | |
Location Alias: 00/09-17-57-24 W4M | |
Location Alias 2: 00/09-17-057-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 24 | |
Section: 17 | |
County/Municipality: Sturgeon County | |
Well Name: DORSET FAIRYDELL 9-17-57-24 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0008805 | |
License Date: 1954-11-30 | |
License Status: Abandoned | |
Spud Date: 1954-12-08 | |
Final Drill Date: 1954-12-31 | |
Well Total Depth: 1226.20 m | |
Surface Hole Latitude: 53.929209 | |
Surface Hole Longitude: -113.523439 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-11-30 | Obtained License |
1954-12-20 | Drill Stem Test Performed |
1954-12-21 | Drill Stem Test Performed |
1954-12-22 | Drill Stem Test Performed |
1954-12-26 | Production Casing Operation Performed |
1954-12-27 | Well Log Performed |
1954-12-31 | Finished Drilling |
1954-12-31 | Perforation Treatment Performed - Open-Hole Completion |
1954-12-31 | Well Mode changed to Drilled and Cased |
1955-01-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-01-16 | Well Began Production |
1955-01-16 | Well Fluid changed to Crude Oil |
1955-01-16 | Well Mode changed to Pumping |
1973-05-03 | Perforation Treatment Performed - Cement Plug |
1973-05-03 | Perforation Treatment Performed - Open-Hole Completion |
1984-12-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-12-06 | Perforation Treatment Performed - Cement Plug |
1984-12-06 | Perforation Treatment Performed - Jet Perforation |
1984-12-06 | Perforation Treatment Performed - Open-Hole Completion |
1985-10-15 | Perforation Treatment Performed - Cement Plug |
1986-02-28 | Well Fluid changed to Crude Oil |
1986-02-28 | Well Mode changed to Suspended |
1987-06-15 | Perforation Treatment Performed - Cement Plug |
1987-06-15 | Plug Back Performed |
1987-06-15 | Well Fluid changed to Crude Oil |
1987-06-15 | Well Mode changed to Abandoned Zone |
1987-06-16 | Well Log Performed |
1987-06-17 | Well Log Performed |
1987-06-26 | Well Log Performed |
1987-09-24 | Well Log Performed |
1987-09-28 | Well Log Performed |
1987-10-02 | Well Log Performed |
1999-06-18 | Perforation Treatment Performed - Jet Perforation |
1999-06-18 | Well Log Performed |
2000-02-14 | Perforation Treatment Performed - Fractured |
2000-02-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-02-26 | Perforation Treatment Performed - Fractured |
2000-02-26 | Perforation Treatment Performed - Jet Perforation |
2000-02-26 | Plug Back Performed |
2000-02-26 | Well Log Performed |
2004-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-11-03 | Plug Back Performed |
2004-11-04 | Well Log Performed |
2004-11-27 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-12-31 | Open Hole/Barefoot Completion | 1213.70 | 1226.20 | 0 |
1987-06-15 | Cement Plug | 1196.50 | 1213.60 | 0 |
1999-06-18 | Perforation | 1022.60 | 1027.00 | 13 |
2000-02-14 | Fracture | 1022.60 | 1027.00 | 0 |
2000-02-26 | Packing Device Capped w/Cement | 1004.00 | 1012.00 | 0 |
2000-02-26 | Perforation | 929.60 | 938.10 | 17 |
2000-02-26 | Fracture | 930.20 | 933.20 | 0 |
2000-02-26 | Fracture | 934.50 | 937.50 | 0 |
2004-11-03 | Packing Device Capped w/Cement | 917.00 | 925.00 | 0 |
1955-01-02 | Acid Treatment | 1213.70 | 1226.20 | 0 |
1973-05-03 | Cement Plug | 1220.40 | 1226.20 | 0 |
1973-05-03 | Open Hole/Barefoot Completion | 1213.70 | 1220.40 | 0 |
1984-12-06 | Cement Plug | 1216.30 | 1220.40 | 0 |
1984-12-06 | Open Hole/Barefoot Completion | 1213.70 | 1216.30 | 0 |
1984-12-06 | Perforation | 1211.10 | 1213.10 | 13 |
1984-12-06 | Acid Treatment | 1211.10 | 1213.10 | 0 |
1985-10-15 | Cement Plug | 1213.60 | 1216.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 3792 | 0.0 | 0.0 | 0.0 |
1974 | 6632 | 0.0 | 0.0 | 0.0 |
1975 | 3155 | 0.0 | 0.0 | 0.0 |
1976 | 3735 | 0.0 | 0.0 | 0.0 |
1977 | 5003 | 0.0 | 0.0 | 0.0 |
1978 | 5225 | 0.0 | 0.0 | 0.0 |
1979 | 7807 | 0.0 | 0.0 | 0.0 |
1980 | 8465 | 0.0 | 0.0 | 0.0 |
1981 | 8050 | 0.0 | 0.0 | 0.0 |
1982 | 8283 | 0.0 | 0.0 | 0.0 |
1983 | 5125 | 0.0 | 0.0 | 0.0 |
1984 | 8013 | 0.0 | 0.0 | 0.0 |
1985 | 2085 | 0.0 | 0.0 | 0.0 |
For data sources see[5]