X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574240816002

Well Details

Well ID: 0574240816002
Loading map...
Location: 00/16-08-057-24W4/2
Location Alias: 00/16-08-57-24 W4M
Location Alias 2: 00/16-08-057-24 W4/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 24
Section: 08
County/Municipality: Sturgeon County
Well Name: DORSET FAIRYDELL 16-8-57-24
Operator Name: Baytex Energy Ltd.
License Number: 0007412
License Date: 1953-12-03
License Status: Suspension
Spud Date: 1953-12-09
Final Drill Date: 1953-12-27
Well Total Depth: 1230.80 m
Surface Hole Latitude: 53.918178
Surface Hole Longitude: -113.524353

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-12-03 Obtained License
1953-12-18 Drill Stem Test Performed
1953-12-19 Drill Stem Test Performed
1953-12-24 Drill Stem Test Performed
1953-12-27 Drill Stem Test Performed
1953-12-27 Finished Drilling
1953-12-27 Well Mode changed to Drilled and Cased
1953-12-28 Perforation Treatment Performed - Open-Hole Completion
1953-12-28 Production Casing Operation Performed
1953-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-31 Perforation Treatment Performed - Cement Plug
1973-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-01 Perforation Treatment Performed - Jet Perforation
1978-05-31 Perforation Treatment Performed - Cement Plug
1993-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-17 Plug Back Performed
1993-03-17 Well Log Performed
1993-03-18 Perforation Treatment Performed - Jet Perforation
1993-03-18 Well Log Performed
1993-04-14 Well Began Production
1993-04-14 Well Fluid changed to Crude Oil
1993-04-14 Well Mode changed to Pumping
1995-01-08 Perforation Treatment Performed - Chemical Squeeze
1995-01-19 Perforation Treatment Performed - Jet Perforation
2000-08-27 Well Log Performed
2011-11-30 Well Fluid changed to Crude Oil
2011-11-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-12-28 Open Hole/Barefoot Completion 1225.30 1230.80 0
1995-01-19 Perforation 1029.20 1030.20 13
1995-01-19 Perforation 1032.50 1033.50 13
1995-01-19 Perforation 1037.00 1039.00 13
1953-12-31 Acid Treatment 1225.30 1230.80 0
1973-01-31 Cement Plug 1225.30 1230.80 0
1973-02-01 Perforation 1219.50 1222.60 7
1973-02-01 Acid Treatment 1219.50 1222.60 0
1978-05-31 Cement Plug 1222.90 1225.00 0
1993-03-17 Packing Device Capped w/Cement 1200.00 1208.00 0
1993-03-18 Perforation 1042.40 1047.40 17
1995-01-08 Chemical Squeeze 1042.40 1047.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5302 0.0 0.0 0.0
1994 7257 0.0 0.0 0.0
1995 7388 0.0 0.0 0.0
1996 8631 0.0 0.0 0.0
1997 8349 0.0 0.0 0.0
1998 8735 0.0 0.0 0.0
1999 8327 0.0 0.0 0.0
2000 7859 0.0 0.0 0.0
2001 8690 0.0 0.0 0.0
2002 8523 0.0 0.0 0.0
2003 8298 0.0 0.0 0.0
2004 6684 0.0 0.0 0.0
2005 8413 0.0 0.0 0.0
2006 8410 0.0 0.0 0.0
2007 8598 0.0 0.0 0.0
2008 8064 0.0 0.0 0.0
2009 8644 0.0 0.0 0.0
2010 1742 0.0 0.0 0.0

For data sources see[5]

References