X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574232510000

Well Details

Well ID: 0574232510000
Loading map...
Location: 00/10-25-057-23W4/0
Location Alias: 00/10-25-57-23 W4M
Location Alias 2: 00/10-25-057-23 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 23
Section: 25
County/Municipality: Sturgeon County
Well Name: WESTFIRE HZ REDWATER 10-25-57-23
Operator Name: Long Run Exploration Ltd.
License Number: 0444185
License Date: 2012-02-15
License Status: Suspension
Spud Date: 2012-03-18
Final Drill Date: 2012-03-21
Well Total Depth: 1482.00 m
Surface Hole Latitude: 53.960197
Surface Hole Longitude: -113.272073

For data sources see[1][2]

Well History

Date Event
2012-02-15 Obtained License
2012-03-18 Well Log Performed
2012-03-19 Direction Drilling Operation Performed - Deviate
2012-03-19 Surface Casing Operation Performed
2012-03-20 Direction Drilling Operation Performed - Horizontal
2012-03-21 Finished Drilling
2012-03-21 Well Mode changed to Drilled and Cased
2012-03-22 Production Casing Operation Performed
2012-03-22 Rig Released
2012-03-23 Well Log Performed
2012-03-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-05 Well Began Production
2012-04-05 Well Fluid changed to Crude Oil
2012-04-05 Well Mode changed to Flowing
2016-05-01 Well Fluid changed to Crude Oil
2016-05-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-18 Ensign Drilling Inc. 521 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-19 454.10 Deviate (5 - 79 degrees)
2012-03-20 845.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-30 Multi-Stage Fracture 1466.50 1466.70 0
2012-03-30 Multi-Stage Fracture 1166.10 1166.30 0
2012-03-30 Multi-Stage Fracture 1131.70 1131.90 0
2012-03-30 Multi-Stage Fracture 1097.30 1097.50 0
2012-03-30 Multi-Stage Fracture 1063.30 1063.50 0
2012-03-30 Multi-Stage Fracture 1040.00 1040.20 0
2012-03-30 Multi-Stage Fracture 1016.80 1017.00 0
2012-03-30 Multi-Stage Fracture 994.30 994.50 0
2012-03-31 Multi-Stage Fracture 971.00 971.20 0
2012-03-31 Multi-Stage Fracture 947.70 947.90 0
2012-03-31 Multi-Stage Fracture 924.40 924.60 0
2012-03-30 Multi-Stage Fracture 1432.00 1432.10 0
2012-03-31 Multi-Stage Fracture 902.30 902.50 0
2012-03-30 Multi-Stage Fracture 1406.00 1406.10 0
2012-03-30 Multi-Stage Fracture 1371.60 1371.80 0
2012-03-30 Multi-Stage Fracture 1337.20 1337.40 0
2012-03-30 Multi-Stage Fracture 1302.90 1303.10 0
2012-03-30 Multi-Stage Fracture 1268.40 1268.60 0
2012-03-30 Multi-Stage Fracture 1234.30 1234.50 0
2012-03-30 Multi-Stage Fracture 1200.60 1200.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6112 0.0 0.0 0.0
2013 8498 0.0 0.0 0.0
2014 7897 0.0 0.0 0.0
2015 1230 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-03 No Incident Encountered 0.00 0.00

For data sources see[8]

References