X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574222105000

Well Details

Well ID: 0574222105000
Loading map...
Location: 00/05-21-057-22W4/0
Location Alias: 00/05-21-57-22 W4M
Location Alias 2: 00/05-21-057-22 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 22
Section: 21
County/Municipality: Sturgeon County
Well Name: LONG RUN HZ REDWATER 5-21-57-22
Operator Name: Long Run Exploration Ltd.
License Number: 0415954
License Date: 2009-12-21
License Status: Suspension
Spud Date: 2010-02-06
Final Drill Date: 2010-02-11
Well Total Depth: 1649.00 m
Surface Hole Latitude: 53.940136
Surface Hole Longitude: -113.208585

For data sources see[1][2]

Well History

Date Event
2009-12-21 Obtained License
2010-02-07 Surface Casing Operation Performed
2010-02-07 Well Log Performed
2010-02-08 Direction Drilling Operation Performed - Horizontal
2010-02-11 Finished Drilling
2010-02-11 Well Log Performed
2010-02-11 Well Mode changed to Drilled and Cased
2010-02-12 Production Casing Operation Performed
2010-02-13 Rig Released
2010-02-28 Perforation Treatment Performed - Fractured
2010-02-28 Perforation Treatment Performed - Jet Perforation
2010-04-01 Well Began Production
2010-04-01 Well Fluid changed to Crude Oil
2010-04-01 Well Mode changed to Pumping
2012-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-30 Well Fluid changed to Crude Oil
2018-11-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-08 392.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-28 Perforation 1632.70 1633.00 10
2010-02-28 Fracture 1461.10 1561.40 0
2010-02-28 Perforation 1418.10 1418.40 10
2010-02-28 Fracture 1418.10 1418.40 0
2010-02-28 Perforation 1375.10 1375.40 10
2010-02-28 Fracture 1375.10 1375.40 0
2010-02-28 Perforation 1332.10 1332.40 10
2010-02-28 Fracture 1332.10 1332.40 0
2010-02-28 Perforation 1289.10 1289.50 10
2010-02-28 Fracture 1289.10 1289.50 0
2010-02-28 Perforation 1246.10 1246.40 10
2010-02-28 Fracture 1632.70 1633.00 0
2010-02-28 Fracture 1246.10 1246.40 0
2010-02-28 Perforation 1203.20 1203.50 10
2010-02-28 Fracture 1203.20 1203.50 0
2010-02-28 Perforation 1172.30 1172.70 10
2010-02-28 Fracture 1172.30 1172.70 0
2010-02-28 Perforation 1141.10 1141.50 10
2010-02-28 Fracture 1141.10 1141.50 0
2010-02-28 Perforation 1110.30 1110.70 10
2010-02-28 Fracture 1110.30 1110.70 0
2010-02-28 Perforation 1079.00 1079.40 10
2010-02-28 Perforation 1589.70 1590.10 10
2010-02-28 Fracture 1079.00 1079.40 0
2012-02-20 Multi-Stage Fracture 1048.20 1048.50 0
2012-02-20 Multi-Stage Fracture 1017.40 1017.80 0
2012-02-20 Multi-Stage Fracture 986.40 986.80 0
2012-02-20 Multi-Stage Fracture 955.40 955.80 0
2012-02-20 Multi-Stage Fracture 924.60 924.90 0
2010-02-28 Fracture 1589.70 1590.10 0
2010-02-28 Perforation 1546.90 1547.30 10
2010-02-28 Fracture 1546.90 1547.30 0
2010-02-28 Perforation 1504.10 1504.50 10
2010-02-28 Fracture 1504.10 1504.50 0
2010-02-28 Perforation 1461.10 1561.40 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6270 0.0 0.0 0.0
2011 8561 0.0 0.0 0.0
2012 8448 0.0 0.0 0.0
2013 8652 0.0 0.0 0.0
2014 8502 0.0 0.0 0.0
2015 8691 0.0 0.0 0.0
2016 7977 0.0 0.0 0.0

For data sources see[6]

References