X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574212210000

Well Details

Well ID: 0574212210000
Loading map...
Location: 00/10-22-057-21W4/0
Location Alias: 00/10-22-57-21 W4M
Location Alias 2: 00/10-22-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 22
County/Municipality: Sturgeon County
Well Name: ACCEL HOLDINGS REDWATER 10-22-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001163
License Date: 1950-02-02
License Status: Issued
Spud Date: 1950-03-31
Final Drill Date: 1950-04-07
Well Total Depth: 1013.50 m
Surface Hole Latitude: 53.943478
Surface Hole Longitude: -113.034798

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-02-02 Obtained License
1950-04-07 Finished Drilling
1950-04-07 Well Mode changed to Drilled and Cased
1950-04-08 Production Casing Operation Performed
1950-04-08 Well Log Performed
1950-04-10 Perforation Treatment Performed - Open-Hole Completion
1950-04-11 Perforation Treatment Performed - Acid Wash - No Pressure
1950-04-14 Well Began Production
1950-04-14 Well Fluid changed to Crude Oil
1950-04-14 Well Mode changed to Flowing
1950-08-21 Well Fluid changed to Crude Oil
1950-08-21 Well Mode changed to Pumping
1961-03-18 Perforation Treatment Performed - Open-Hole Completion
1961-03-19 Well Log Performed
1961-03-20 Well Type changed to Observation
1973-06-18 Well Fluid changed to Crude Oil
1973-06-18 Well Mode changed to Pumping
2002-02-19 Perforation Treatment Performed - Open-Hole Completion
2002-02-19 Well Log Performed
2009-08-28 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-04-10 Open Hole/Barefoot Completion 975.40 981.80 0
1950-04-11 Acid Wash 975.40 981.80 0
1961-03-18 Open Hole/Barefoot Completion 975.40 981.80 0
2002-02-19 Open Hole/Barefoot Completion 975.40 979.40 0
2009-08-28 Perforation 973.80 977.80 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1973 592 0.0 0.0 0.0
1974 7505 0.0 0.0 0.0
1975 8368 0.0 0.0 0.0
1976 8378 0.0 0.0 0.0
1977 7899 0.0 0.0 0.0
1978 8601 0.0 0.0 0.0
1979 8420 0.0 0.0 0.0
1980 8269 0.0 0.0 0.0
1981 8140 0.0 0.0 0.0
1982 8518 0.0 0.0 0.0
1983 8712 0.0 0.0 0.0
1984 8587 0.0 0.0 0.0
1985 8631 0.0 0.0 0.0
1986 8540 0.0 0.0 0.0
1987 8741 0.0 0.0 0.0
1988 8477 0.0 0.0 0.0
1989 8614 0.0 0.0 0.0
1990 8467 0.0 0.0 0.0
1991 8733 0.0 0.0 0.0
1992 8234 0.0 0.0 0.0
1993 8294 0.0 0.0 0.0
1994 8414 0.0 0.0 0.0
1995 8586 0.0 0.0 0.0
1996 8763 0.0 0.0 0.0
1997 8737 0.0 0.0 0.0
1998 8261 0.0 0.0 0.0
1999 8421 0.0 0.0 0.0
2000 8760 0.0 0.0 0.0
2001 8688 0.0 0.0 0.0
2002 8379 0.0 0.0 0.0
2003 7892 0.0 0.0 0.0
2004 8774 0.0 0.0 0.0
2005 8300 0.0 0.0 0.0
2006 8697 0.0 0.0 0.0
2007 8719 0.0 0.0 0.0
2008 8411 0.0 0.0 0.0
2009 8219 0.0 0.0 0.0
2010 8748 0.0 0.0 0.0
2011 8504 0.0 0.0 0.0
2012 8702 0.0 0.0 0.0
2013 7969 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8114 0.0 0.0 0.0
2016 8238 0.0 0.0 0.0
2017 8683 0.0 0.0 0.0
2018 8131 0.0 0.0 0.0
2019 8686 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[5]

References