X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574212016000

Well Details

Well ID: 0574212016000
Loading map...
Location: 00/16-20-057-21W4/0
Location Alias: 00/16-20-57-21 W4M
Location Alias 2: 00/16-20-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 20
County/Municipality: Redwater
Well Name: ARC REDW 16-20-57-21
Operator Name: ARC Resources Ltd.
License Number: 0000148
License Date: 1949-06-27
License Status: RecCertified
Spud Date: 1949-08-11
Final Drill Date: 1949-08-24
Well Total Depth: 992.40 m
Surface Hole Latitude: 53.947096
Surface Hole Longitude: -113.078202

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-06-27 Obtained License
1949-08-20 Production Casing Operation Performed
1949-08-24 Finished Drilling
1949-08-24 Perforation Treatment Performed - Open-Hole Completion
1949-08-24 Well Mode changed to Drilled and Cased
1949-08-25 Perforation Treatment Performed - Acid Wash - No Pressure
1949-08-25 Well Began Production
1949-08-25 Well Fluid changed to Crude Oil
1949-08-25 Well Mode changed to Flowing
1950-08-10 Well Fluid changed to Crude Oil
1950-08-10 Well Mode changed to Pumping
1995-06-01 Well Fluid changed to Crude Oil
1995-06-01 Well Mode changed to Suspended
1996-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-12 Plug Back Performed
1996-03-12 Well Fluid changed to Crude Oil
1996-03-12 Well Mode changed to Abandoned Zone
1996-05-14 Perforation Treatment Performed - Jet Perforation
1996-06-01 Perforation Treatment Performed - Remedial Casing
1996-06-10 Well Abandoned
1996-06-10 Well Fluid changed to Crude Oil
1996-06-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-08-24 Open Hole/Barefoot Completion 947.90 992.40 0
1949-08-25 Acid Wash 947.90 992.40 0
1996-03-12 Packing Device Capped w/Cement 935.50 943.50 0
1996-05-14 Perforation 209.00 210.00 13
1996-06-01 Remedial Casing Cementing 209.00 210.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 1846 0.0 0.0 0.0
1973 7550 0.0 0.0 0.0
1974 6566 0.0 0.0 0.0
1975 3262 0.0 0.0 0.0
1976 6329 0.0 0.0 0.0
1977 6392 0.0 0.0 0.0
1978 8257 0.0 0.0 0.0
1979 8311 0.0 0.0 0.0
1980 8184 0.0 0.0 0.0
1981 8497 0.0 0.0 0.0
1982 8527 0.0 0.0 0.0
1983 8668 0.0 0.0 0.0
1984 8572 0.0 0.0 0.0
1985 8601 0.0 0.0 0.0
1986 8607 0.0 0.0 0.0
1987 8650 0.0 0.0 0.0
1988 7882 0.0 0.0 0.0
1989 8604 0.0 0.0 0.0
1990 8486 0.0 0.0 0.0
1991 8738 0.0 0.0 0.0
1992 8457 0.0 0.0 0.0
1993 8750 0.0 0.0 0.0
1994 4452 0.0 0.0 0.0

For data sources see[5]

References