X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574212006020

Well Details

Well ID: 0574212006020
Loading map...
Location: 02/06-20-057-21W4/0
Location Alias: 02/06-20-57-21 W4M
Location Alias 2: 02/06-20-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 20
County/Municipality: Redwater
Well Name: IMPERIAL REDWATER NO. 115
Operator Name: Imperial Oil Resources Limited
License Number: 0004359
License Date: 1952-03-13
License Status: RecCertified
Spud Date: 1952-06-19
Final Drill Date: 1952-06-24
Well Total Depth: 664.50 m
Surface Hole Latitude: 53.940661
Surface Hole Longitude: -113.088435

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-13 Obtained License
1952-06-24 Finished Drilling
1952-06-25 Production Casing Operation Performed
1952-06-25 Well Mode changed to Drilled and Cased
1952-06-27 Perforation Treatment Performed - Bullet Perforation
1957-05-21 Well Began Production
1957-05-21 Well Fluid changed to Gas
1957-05-21 Well Mode changed to Flowing
1976-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-27 Perforation Treatment Performed - Jet Perforation
1976-12-07 Perforation Treatment Performed - Alcohol Squeeze
1983-03-31 Perforation Treatment Performed - Fractured
1986-06-01 Well Fluid changed to Gas
1986-06-01 Well Mode changed to Suspended
1996-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-21 Plug Back Performed
1996-05-14 Perforation Treatment Performed - Jet Perforation
1996-05-22 Perforation Treatment Performed - Remedial Casing
1996-06-10 Well Abandoned
1996-06-10 Well Fluid changed to Gas
1996-06-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-06-27 Bullet Perforation 651.40 654.40 13
1976-07-27 Perforation 624.20 625.80 7
1976-07-27 Perforation 637.30 638.90 7
1976-07-27 Acid Treatment 624.20 638.90 0
1976-12-07 Alchohol Squeeze 624.20 654.40 0
1983-03-31 Fracture 624.20 654.40 0
1996-03-21 Packing Device Capped w/Cement 607.00 615.50 0
1996-05-14 Perforation 160.00 161.00 13
1996-05-22 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 720 0.0 0.0 0.0
1969 5760 0.0 0.0 0.0
1970 8495 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8040 0.0 0.0 0.0
1973 8759 0.0 0.0 0.0
1974 8735 0.0 0.0 0.0
1975 8733 0.0 0.0 0.0
1976 7277 0.0 0.0 0.0
1977 5682 0.0 0.0 0.0
1978 6951 0.0 0.0 0.0
1979 8543 0.0 0.0 0.0
1980 2622 0.0 0.0 0.0
1981 8306 0.0 0.0 0.0
1982 8282 0.0 0.0 0.0
1983 8233 0.0 0.0 0.0
1984 8106 0.0 0.0 0.0
1985 8714 0.0 0.0 0.0
1986 2894 0.0 0.0 0.0

For data sources see[5]

References