X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211915000

Well Details

Well ID: 0574211915000
Loading map...
Location: 00/15-19-057-21W4/0
Location Alias: 00/15-19-57-21 W4M
Location Alias 2: 00/15-19-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 19
County/Municipality: Redwater
Well Name: W.SHKOLNY NO 15
Operator Name: Imperial Oil Resources Limited
License Number: 0000045
License Date: 1949-06-08
License Status: RecCertified
Spud Date: 1949-07-05
Final Drill Date: 1949-07-18
Well Total Depth: 1004.90 m
Surface Hole Latitude: 53.946902
Surface Hole Longitude: -113.107691

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-06-08 Obtained License
1949-07-14 Production Casing Operation Performed
1949-07-18 Finished Drilling
1949-07-18 Perforation Treatment Performed - Open-Hole Completion
1949-07-18 Well Mode changed to Drilled and Cased
1949-07-21 Well Began Production
1949-07-21 Well Fluid changed to Crude Oil
1949-07-21 Well Mode changed to Flowing
1950-06-02 Perforation Treatment Performed - Acid Wash - No Pressure
1950-07-22 Well Fluid changed to Crude Oil
1950-07-22 Well Mode changed to Pumping
1972-10-20 Perforation Treatment Performed - Acid Wash - No Pressure
1972-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-01 Well Fluid changed to Crude Oil
1994-09-01 Well Mode changed to Suspended
1995-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-01 Perforation Treatment Performed - Jet Perforation
1995-03-01 Plug Back Performed
1995-03-01 Well Log Performed
1995-04-25 Perforation Treatment Performed - Remedial Casing
1995-04-25 Well Fluid changed to Crude Oil
1995-04-25 Well Mode changed to Abandoned
1995-04-28 Well Abandoned
2014-10-24 Well Log Performed
2014-10-25 Perforation Treatment Performed - Jet Perforation
2014-10-25 Well Log Performed
2014-10-26 Perforation Treatment Performed - Cement Plug
2014-10-26 Perforation Treatment Performed - Remedial Casing
2014-10-26 Plug Back Performed
2014-10-27 Perforation Treatment Performed - Jet Perforation
2014-10-27 Well Log Performed
2014-10-28 Perforation Treatment Performed - Cement Plug
2014-10-28 Perforation Treatment Performed - Remedial Casing
2014-10-29 Perforation Treatment Performed - Jet Perforation
2014-10-29 Well Log Performed
2014-10-30 Perforation Treatment Performed - Cement Plug
2014-10-30 Perforation Treatment Performed - Remedial Casing
2014-10-31 Well Log Performed
2014-11-06 Well Log Performed
2014-11-15 Perforation Treatment Performed - Cement Plug
2014-11-15 Perforation Treatment Performed - Jet Perforation
2014-11-15 Perforation Treatment Performed - Remedial Casing
2014-11-15 Well Log Performed
2014-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-07-18 Open Hole/Barefoot Completion 987.20 1004.90 0
2014-10-26 Remedial Casing Cementing 370.00 551.00 0
2014-10-26 Cement Plug 367.40 973.00 0
2014-10-27 Perforation 275.00 276.00 17
2014-10-28 Remedial Casing Cementing 275.00 276.00 0
2014-10-28 Cement Plug 271.00 366.50 0
2014-10-29 Perforation 255.00 256.00 17
2014-10-29 Perforation 244.00 245.00 17
2014-10-30 Remedial Casing Cementing 244.00 256.00 0
2014-10-30 Cement Plug 240.20 272.00 0
2014-11-15 Perforation 226.00 227.00 17
1950-06-02 Acid Wash 987.20 1004.90 0
2014-11-15 Perforation 220.00 221.00 99
2014-11-15 Perforation 211.00 212.00 17
2014-11-15 Perforation 207.00 208.00 17
2014-11-15 Perforation 203.00 204.00 17
2014-11-15 Perforation 199.00 200.00 99
2014-11-15 Perforation 191.00 192.00 17
2014-11-15 Remedial Casing Cementing 191.00 227.00 0
2014-11-15 Cement Plug 181.40 240.00 0
2014-11-16 Packing Device Capped w/Cement 144.00 181.00 0
1972-10-20 Acid Wash 987.20 1004.90 0
1972-10-26 Acid Treatment 987.20 1004.90 0
1995-03-01 Packing Device Capped w/Cement 973.00 981.00 0
1995-03-01 Perforation 220.00 221.00 13
1995-04-25 Remedial Casing Cementing 220.00 221.00 0
2014-10-25 Perforation 550.00 551.00 17
2014-10-25 Perforation 370.00 371.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6870 0.0 0.0 0.0
1968 6950 0.0 0.0 0.0
1969 7038 0.0 0.0 0.0
1970 6233 0.0 0.0 0.0
1971 4980 0.0 0.0 0.0
1972 7108 0.0 0.0 0.0
1973 8318 0.0 0.0 0.0
1974 8425 0.0 0.0 0.0
1975 8481 0.0 0.0 0.0
1976 8689 0.0 0.0 0.0
1977 8277 0.0 0.0 0.0
1978 8307 0.0 0.0 0.0
1979 8370 0.0 0.0 0.0
1980 8341 0.0 0.0 0.0
1981 8513 0.0 0.0 0.0
1982 8496 0.0 0.0 0.0
1983 8698 0.0 0.0 0.0
1984 8521 0.0 0.0 0.0
1985 8264 0.0 0.0 0.0
1986 8315 0.0 0.0 0.0
1987 8633 0.0 0.0 0.0
1988 8386 0.0 0.0 0.0
1989 8444 0.0 0.0 0.0
1990 8342 0.0 0.0 0.0
1991 8716 0.0 0.0 0.0
1992 7020 0.0 0.0 0.0
1993 8420 0.0 0.0 0.0
1994 5072 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References