X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211816000

Well Details

Well ID: 0574211816000
Loading map...
Location: 00/16-18-057-21W4/0
Location Alias: 00/16-18-57-21 W4M
Location Alias 2: 00/16-18-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 18
County/Municipality: Sturgeon County
Well Name: IMPERIAL REDWATER NO. 55
Operator Name: Imperial Oil Resources Limited
License Number: 0000965
License Date: 1949-11-29
License Status: RecCertified
Spud Date: 1949-12-08
Final Drill Date: 1950-01-07
Well Total Depth: 1007.70 m
Surface Hole Latitude: 53.933134
Surface Hole Longitude: -113.102083

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-11-29 Obtained License
1949-12-21 Production Casing Operation Performed
1949-12-31 Drill Stem Test Performed
1950-01-06 Drill Stem Test Performed
1950-01-07 Drill Stem Test Performed
1950-01-07 Finished Drilling
1950-01-07 Perforation Treatment Performed - Open-Hole Completion
1950-01-07 Well Mode changed to Drilled and Cased
1950-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-01-26 Well Began Production
1950-01-26 Well Fluid changed to Crude Oil
1950-01-26 Well Mode changed to Flowing
1950-06-22 Well Fluid changed to Crude Oil
1950-06-22 Well Mode changed to Pumping
1983-12-01 Well Fluid changed to Crude Oil
1983-12-01 Well Mode changed to Suspended
1985-05-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-01 Plug Back Performed
1985-05-01 Well Fluid changed to Crude Oil
1985-05-01 Well Mode changed to Abandoned Zone
1985-05-02 Perforation Treatment Performed - Jet Perforation
1985-05-07 Perforation Treatment Performed - Jet Perforation
1985-05-07 Well Log Performed
1985-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-10 Plug Back Performed
1985-05-13 Perforation Treatment Performed - Fractured
1985-05-13 Perforation Treatment Performed - Jet Perforation
1985-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-16 Perforation Treatment Performed - Jet Perforation
1985-05-16 Plug Back Performed
1985-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-22 Perforation Treatment Performed - Jet Perforation
1985-05-22 Well Log Performed
1985-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-29 Perforation Treatment Performed - Jet Perforation
1992-09-29 Plug Back Performed
1992-10-01 Perforation Treatment Performed - Remedial Casing
1992-10-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-01-07 Open Hole/Barefoot Completion 995.80 1007.70 0
1985-05-14 Acid Treatment 762.00 768.00 0
1985-05-16 Packing Device Capped w/Cement 749.00 750.00 0
1985-05-16 Perforation 724.00 728.00 13
1985-05-17 Acid Treatment 724.00 728.00 0
1985-05-22 Packing Device Capped w/Cement 697.00 705.00 0
1985-05-22 Perforation 651.00 654.00 13
1985-05-23 Acid Treatment 651.00 654.00 0
1992-09-29 Packing Device Capped w/Cement 619.90 627.90 0
1992-09-29 Perforation 191.30 192.30 7
1992-10-01 Remedial Casing Cementing 191.30 192.30 0
1950-01-09 Acid Treatment 995.80 1007.70 0
1985-05-01 Packing Device Capped w/Cement 968.50 980.00 0
1985-05-02 Perforation 810.00 811.50 13
1985-05-07 Perforation 792.00 795.20 13
1985-05-08 Acid Treatment 792.00 795.20 0
1985-05-10 Packing Device Capped w/Cement 784.00 785.00 0
1985-05-13 Perforation 762.00 768.00 13
1985-05-13 Fracture 762.00 768.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3868 0.0 0.0 0.0
1968 5586 0.0 0.0 0.0
1969 8231 0.0 0.0 0.0
1970 7300 0.0 0.0 0.0
1971 7425 0.0 0.0 0.0
1972 7809 0.0 0.0 0.0
1973 8227 0.0 0.0 0.0
1974 8158 0.0 0.0 0.0
1975 8396 0.0 0.0 0.0
1976 8635 0.0 0.0 0.0
1977 7889 0.0 0.0 0.0
1978 8468 0.0 0.0 0.0
1979 7345 0.0 0.0 0.0
1980 6868 0.0 0.0 0.0
1981 8569 0.0 0.0 0.0
1982 8080 0.0 0.0 0.0
1983 3854 0.0 0.0 0.0

For data sources see[5]

References