X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211505000

Well Details

Well ID: 0574211505000
Loading map...
Location: 00/05-15-057-21W4/0
Location Alias: 00/05-15-57-21 W4M
Location Alias 2: 00/05-15-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 15
County/Municipality: Sturgeon County
Well Name: ACCEL HOLDINGS REDWATER 5-15-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: B0002664
License Date: 1949-02-25
License Status: Issued
Spud Date: 1949-03-12
Final Drill Date: 1949-03-31
Well Total Depth: 982.70 m
Surface Hole Latitude: 53.925411
Surface Hole Longitude: -113.046962

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-02-25 Obtained License
1949-03-26 Production Casing Operation Performed
1949-03-31 Finished Drilling
1949-03-31 Perforation Treatment Performed - Open-Hole Completion
1949-03-31 Well Mode changed to Drilled and Cased
1949-04-01 Well Began Production
1949-04-01 Well Fluid changed to Crude Oil
1949-04-01 Well Mode changed to Flowing
1949-04-03 Perforation Treatment Performed - Acid Wash - No Pressure
1951-01-29 Well Fluid changed to Crude Oil
1951-01-29 Well Mode changed to Pumping
1980-02-06 Well Log Performed
1986-02-05 Perforation Treatment Performed - Cement Plug
1986-02-05 Perforation Treatment Performed - Open-Hole Completion
1986-02-06 Perforation Treatment Performed - Jet Perforation
1986-02-07 Perforation Treatment Performed - Acid Wash - No Pressure
1995-01-05 Perforation Treatment Performed - Cement Plug
1995-01-05 Perforation Treatment Performed - Open-Hole Completion
1995-01-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-03-31 Open Hole/Barefoot Completion 954.00 982.70 0
1949-04-03 Acid Wash 954.00 982.70 0
1986-02-05 Cement Plug 958.60 982.70 0
1986-02-05 Open Hole/Barefoot Completion 954.00 958.60 0
1986-02-06 Perforation 951.60 953.60 13
1986-02-07 Acid Wash 951.60 953.60 0
1995-01-05 Cement Plug 957.40 958.60 0
1995-01-05 Open Hole/Barefoot Completion 954.00 957.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6725 0.0 0.0 0.0
1968 6142 0.0 0.0 0.0
1969 7501 0.0 0.0 0.0
1970 6321 0.0 0.0 0.0
1971 6351 0.0 0.0 0.0
1972 7984 0.0 0.0 0.0
1973 8265 0.0 0.0 0.0
1974 6666 0.0 0.0 0.0
1975 5270 0.0 0.0 0.0
1976 2135 0.0 0.0 0.0
1977 2209 0.0 0.0 0.0
1978 2586 0.0 0.0 0.0
1979 7341 0.0 0.0 0.0
1980 8081 0.0 0.0 0.0
1981 8210 0.0 0.0 0.0
1982 8433 0.0 0.0 0.0
1983 8693 0.0 0.0 0.0
1984 8532 0.0 0.0 0.0
1985 8524 0.0 0.0 0.0
1986 8391 0.0 0.0 0.0
1987 8701 0.0 0.0 0.0
1988 8440 0.0 0.0 0.0
1989 8458 0.0 0.0 0.0
1990 8466 0.0 0.0 0.0
1991 8496 0.0 0.0 0.0
1992 8418 0.0 0.0 0.0
1993 8709 0.0 0.0 0.0
1994 6971 0.0 0.0 0.0
1995 8457 0.0 0.0 0.0
1996 8621 0.0 0.0 0.0
1997 8690 0.0 0.0 0.0
1998 8556 0.0 0.0 0.0
1999 8428 0.0 0.0 0.0
2000 6827 0.0 0.0 0.0
2001 8308 0.0 0.0 0.0
2002 8361 0.0 0.0 0.0
2003 8724 0.0 0.0 0.0
2004 8591 0.0 0.0 0.0
2005 8365 0.0 0.0 0.0
2006 8703 0.0 0.0 0.0
2007 8673 0.0 0.0 0.0
2008 8145 0.0 0.0 0.0
2009 7668 0.0 0.0 0.0
2010 8724 0.0 0.0 0.0
2011 8745 0.0 0.0 0.0
2012 8322 0.0 0.0 0.0
2013 8107 0.0 0.0 0.0
2014 8743 0.0 0.0 0.0
2015 8311 0.0 0.0 0.0
2016 8136 0.0 0.0 0.0
2017 8156 0.0 0.0 0.0
2018 7550 0.0 0.0 0.0
2019 7120 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References