X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211412000

Well Details

Well ID: 0574211412000
Loading map...
Location: 00/12-14-057-21W4/0
Location Alias: 00/12-14-57-21 W4M
Location Alias 2: 00/12-14-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 14
County/Municipality: Sturgeon County
Well Name: IMPERIAL AMELIA NO. 3
Operator Name: Imperial Oil Limited
License Number: B0002768
License Date: 1949-04-11
License Status: RecCertified
Spud Date: 1949-04-11
Final Drill Date: 1949-05-05
Well Total Depth: 1011.60 m
Surface Hole Latitude: 53.929018
Surface Hole Longitude: -113.021740

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-04-11 Obtained License
1949-04-28 Liner Casing Operation Performed
1949-05-05 Drill Stem Test Performed
1949-05-05 Finished Drilling
1949-05-05 Well Mode changed to Drilled and Cased
1949-05-06 Perforation Treatment Performed - Acid Wash - No Pressure
1949-05-06 Perforation Treatment Performed - Bullet Perforation
1949-05-18 Perforation Treatment Performed - Cement Squeeze
1949-05-23 Perforation Treatment Performed - Bullet Perforation
1949-05-23 Perforation Treatment Performed - Cement Squeeze
1949-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-05-26 Perforation Treatment Performed - Bullet Perforation
1949-05-27 Well Began Production
1949-05-27 Well Fluid changed to Crude Oil
1949-05-27 Well Mode changed to Flowing
1949-10-29 Perforation Treatment Performed - Bullet Perforation
1949-10-30 Perforation Treatment Performed - Bullet Perforation
1949-10-31 Perforation Treatment Performed - Jet Perforation
1949-11-01 Perforation Treatment Performed - Cement Squeeze
1949-11-01 Perforation Treatment Performed - Jet Perforation
1949-11-14 Perforation Treatment Performed - Acid Wash - No Pressure
1950-05-26 Well Fluid changed to Crude Oil
1950-05-26 Well Mode changed to Pumping
1967-09-14 Perforation Treatment Performed - Cement Plug
1967-09-18 Well Fluid changed to Crude Oil
1967-09-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-05-06 Bullet Perforation 976.30 993.30 16
1949-10-30 Bullet Perforation 996.40 997.00 7
1949-10-31 Perforation 996.40 997.30 10
1949-10-31 Perforation 995.20 996.10 10
1949-11-01 Perforation 1002.80 1003.40 10
1949-11-01 Cement Squeeze 995.20 1003.40 0
1949-11-01 Cement Squeeze 976.00 993.30 0
1949-11-01 Perforation 973.80 979.90 7
1949-11-14 Acid Wash 973.80 979.90 0
1967-09-14 Cement Plug 920.50 984.50 0
1949-05-06 Acid Wash 976.30 993.30 0
1949-05-06 Bullet Perforation 999.40 999.70 16
1949-05-18 Cement Squeeze 999.40 999.70 0
1949-05-23 Bullet Perforation 1000.70 1001.30 16
1949-05-23 Cement Squeeze 1000.70 1001.30 0
1949-05-26 Bullet Perforation 976.00 987.60 7
1949-05-26 Acid Treatment 976.00 990.00 0
1949-10-29 Bullet Perforation 1001.30 1003.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References