X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211409000

Well Details

Well ID: 0574211409000
Loading map...
Location: 00/09-14-057-21W4/0
Location Alias: 00/09-14-57-21 W4M
Location Alias 2: 00/09-14-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 14
County/Municipality: Sturgeon County
Well Name: IMPERIAL AMELIA NO. 50
Operator Name: Imperial Oil Limited
License Number: 0001680
License Date: 1950-06-29
License Status: RecCertified
Spud Date: 1950-07-19
Final Drill Date: 1950-07-28
Well Total Depth: 1005.80 m
Surface Hole Latitude: 53.928994
Surface Hole Longitude: -113.003898

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-29 Obtained License
1950-07-28 Drill Stem Test Performed
1950-07-28 Finished Drilling
1950-07-28 Well Mode changed to Drilled and Cased
1950-07-29 Liner Casing Operation Performed
1950-07-29 Perforation Treatment Performed - Open-Hole Completion
1950-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-08-17 Perforation Treatment Performed - Jet Perforation
1950-09-15 Well Began Production
1950-09-15 Well Fluid changed to Crude Oil
1950-09-15 Well Mode changed to Pumping
1951-08-18 Perforation Treatment Performed - Acid Wash - No Pressure
1951-08-18 Perforation Treatment Performed - Cement Squeeze
1951-08-20 Perforation Treatment Performed - Acid Wash - No Pressure
1951-08-20 Perforation Treatment Performed - Bullet Perforation
1958-05-01 Well Fluid changed to Crude Oil
1958-05-01 Well Mode changed to Suspended
1958-07-05 Perforation Treatment Performed - Bullet Perforation
1958-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-07-08 Perforation Treatment Performed - Bullet Perforation
1958-07-10 Perforation Treatment Performed - Cement Squeeze
1958-07-18 Well Fluid changed to Crude Oil
1958-07-18 Well Mode changed to Pumping
1966-12-12 Perforation Treatment Performed - Cement Plug
1966-12-17 Well Abandoned
1966-12-17 Well Fluid changed to Crude Oil
1966-12-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-07-29 Open Hole/Barefoot Completion 984.80 1000.00 0
1958-07-08 Bullet Perforation 767.50 770.50 13
1958-07-10 Cement Squeeze 767.50 770.50 0
1958-07-10 Cement Squeeze 614.20 618.70 0
1966-12-12 Cement Plug 888.80 943.70 0
1950-07-31 Acid Treatment 984.80 1000.00 0
1950-08-17 Perforation 996.70 999.10 3
1951-08-18 Acid Wash 996.70 999.10 0
1951-08-18 Cement Squeeze 996.70 999.10 0
1951-08-20 Bullet Perforation 989.10 994.60 7
1951-08-20 Acid Wash 989.10 994.60 0
1958-07-05 Bullet Perforation 614.20 618.70 10
1958-07-07 Acid Treatment 614.20 618.70 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References