If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574211205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.910741,"lon":-112.997463,"icon":""}]} |
Location: 00/05-12-057-21W4/0 | |
Location Alias: 00/05-12-57-21 W4M | |
Location Alias 2: 00/05-12-057-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 21 | |
Section: 12 | |
County/Municipality: Sturgeon County | |
Well Name: ACCEL HOLDINGS REDWATER 5-12-57-21 | |
Operator Name: ACCEL Canada Holdings Limited | |
License Number: 0001994 | |
License Date: 1950-09-08 | |
License Status: Abandoned | |
Spud Date: 1950-11-02 | |
Final Drill Date: 1950-11-13 | |
Well Total Depth: 986.60 m | |
Surface Hole Latitude: 53.910741 | |
Surface Hole Longitude: -112.997463 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-09-08 | Obtained License |
1950-11-11 | Production Casing Operation Performed |
1950-11-13 | Finished Drilling |
1950-11-13 | Perforation Treatment Performed - Acid Wash - No Pressure |
1950-11-13 | Perforation Treatment Performed - Open-Hole Completion |
1950-11-13 | Well Mode changed to Drilled and Cased |
1950-11-14 | Well Began Production |
1950-11-14 | Well Fluid changed to Crude Oil |
1950-11-14 | Well Mode changed to Flowing |
1951-02-03 | Well Fluid changed to Crude Oil |
1951-02-03 | Well Mode changed to Pumping |
1974-10-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-01-01 | Well Fluid changed to Crude Oil |
1975-01-01 | Well Mode changed to Suspended |
1976-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-12-09 | Well Fluid changed to Crude Oil |
1976-12-09 | Well Mode changed to Pumping |
1977-07-22 | Well Fluid changed to Crude Oil |
1977-07-22 | Well Mode changed to Suspended |
1994-04-18 | Perforation Treatment Performed - Jet Perforation |
1994-04-18 | Well Log Performed |
1994-05-01 | Well Fluid changed to Crude Oil |
1994-05-01 | Well Mode changed to Flowing |
1999-06-07 | Well Fluid changed to Crude Oil |
1999-06-07 | Well Mode changed to Suspended |
1999-06-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-08 | Plug Back Performed |
1999-06-09 | Well Fluid changed to Crude Oil |
1999-06-09 | Well Mode changed to Abandoned Zone |
2000-06-06 | Perforation Treatment Performed - Jet Perforation |
2000-06-06 | Well Log Performed |
2000-06-07 | Perforation Treatment Performed - Cement Squeeze |
2000-06-08 | Perforation Treatment Performed - Jet Perforation |
2000-06-08 | Well Log Performed |
2000-06-09 | Perforation Treatment Performed - Cement Squeeze |
2000-09-18 | Well Abandoned |
2000-09-18 | Well Fluid changed to Crude Oil |
2000-09-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1950-11-13 | Open Hole/Barefoot Completion | 971.40 | 986.60 | 0 |
2000-06-09 | Cement Squeeze | 273.00 | 274.00 | 0 |
1950-11-13 | Acid Wash | 971.40 | 986.60 | 0 |
1974-10-08 | Acid Treatment | 971.40 | 984.50 | 0 |
1976-12-07 | Acid Treatment | 971.70 | 975.40 | 0 |
1994-04-18 | Perforation | 970.70 | 972.90 | 13 |
1999-06-08 | Packing Device Capped w/Cement | 958.00 | 966.00 | 0 |
2000-06-06 | Perforation | 485.00 | 486.00 | 20 |
2000-06-07 | Cement Squeeze | 485.00 | 486.00 | 0 |
2000-06-08 | Perforation | 273.00 | 274.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 3325 | 0.0 | 0.0 | 0.0 |
1974 | 3203 | 0.0 | 0.0 | 0.0 |
1976 | 493 | 0.0 | 0.0 | 0.0 |
1977 | 3372 | 0.0 | 0.0 | 0.0 |
1981 | 81 | 0.0 | 0.0 | 0.0 |
1994 | 2881 | 0.0 | 0.0 | 0.0 |
1995 | 8438 | 0.0 | 0.0 | 0.0 |
1996 | 8327 | 0.0 | 0.0 | 0.0 |
1997 | 8487 | 0.0 | 0.0 | 0.0 |
1998 | 7996 | 0.0 | 0.0 | 0.0 |
1999 | 3624 | 0.0 | 0.0 | 0.0 |
For data sources see[5]