X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574200704020

Well Details

Well ID: 0574200704020
Loading map...
Location: 02/04-07-057-20W4/0
Location Alias: 02/04-07-57-20 W4M
Location Alias 2: 02/04-07-057-20 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 20
Section: 07
County/Municipality: Sturgeon County
Well Name: ACL 4B REDWATER 4-7-57-20
Operator Name: Paramount Resources Ltd.
License Number: 0172597
License Date: 1994-11-16
License Status: Abandoned
Spud Date: 1994-12-14
Final Drill Date: 1994-12-18
Well Total Depth: 890.00 m
Surface Hole Latitude: 53.904947
Surface Hole Longitude: -112.972585

For data sources see[1][2]

Well History

Date Event
1994-11-16 Obtained License
1994-12-15 Direction Drilling Operation Performed - Deviate
1994-12-15 Surface Casing Operation Performed
1994-12-18 Finished Drilling
1994-12-18 Well Mode changed to Drilled and Cased
1994-12-19 Production Casing Operation Performed
1994-12-19 Well Log Performed
1994-12-20 Rig Released
1994-12-29 Well Log Performed
1995-01-14 Perforation Treatment Performed - Jet Perforation
1995-01-23 Well Log Performed
1997-06-16 Well Began Production
1997-06-16 Well Fluid changed to Gas
1997-06-16 Well Mode changed to Flowing
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Pumping
2009-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-26 Plug Back Performed
2009-10-26 Well Fluid changed to Gas
2009-10-26 Well Mode changed to Abandoned Zone
2009-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-29 Perforation Treatment Performed - Jet Perforation
2009-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-30 Perforation Treatment Performed - Jet Perforation
2009-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-31 Perforation Treatment Performed - Jet Perforation
2009-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-01 Perforation Treatment Performed - Remedial Casing
2009-11-04 Perforation Treatment Performed - Jet Perforation
2009-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-05 Perforation Treatment Performed - Remedial Casing
2010-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-29 Perforation Treatment Performed - Jet Perforation
2010-01-31 Perforation Treatment Performed - Remedial Casing
2010-02-03 Perforation Treatment Performed - Jet Perforation
2010-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-05 Perforation Treatment Performed - Remedial Casing
2010-02-08 Well Abandoned
2010-02-08 Well Fluid changed to Gas
2010-02-08 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-12-15 159.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-14 Perforation 860.00 861.00 13
2009-10-31 Acid Treatment 274.00 275.00 0
2009-11-01 Acid Treatment 348.00 349.60 0
2009-11-01 Remedial Casing Cementing 348.00 349.60 0
2009-11-04 Perforation 258.00 259.00 17
2009-11-05 Acid Treatment 258.00 275.00 0
2009-11-05 Remedial Casing Cementing 258.00 275.00 0
2010-01-29 Perforation 344.00 345.00 17
2010-01-29 Acid Treatment 344.00 345.00 0
2010-01-31 Remedial Casing Cementing 344.00 345.00 0
2010-02-03 Perforation 224.00 225.00 17
1995-01-14 Perforation 855.00 856.50 13
2010-02-04 Packing Device Capped w/Cement 262.00 271.00 0
2010-02-04 Packing Device Capped w/Cement 245.00 254.00 0
2010-02-05 Remedial Casing Cementing 224.00 225.00 0
1995-01-14 Perforation 852.00 854.00 13
2009-10-26 Packing Device Capped w/Cement 837.00 845.00 0
2009-10-29 Perforation 349.00 349.60 99
2009-10-29 Acid Treatment 349.00 349.60 0
2009-10-30 Perforation 348.00 349.00 17
2009-10-30 Acid Treatment 348.00 349.00 0
2009-10-31 Perforation 274.00 275.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3862 0.0 0.0 0.0
1998 8378 0.0 0.0 0.0
1999 8147 0.0 0.0 0.0
2000 8464 0.0 0.0 0.0
2001 7755 0.0 0.0 0.0
2002 7731 0.0 0.0 0.0
2003 5660 0.0 0.0 0.0
2004 7101 0.0 0.0 0.0
2005 8303 0.0 0.0 0.0
2006 5207 0.0 0.0 0.0
2007 2255 0.0 0.0 0.0

For data sources see[6]

References