X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565221313003

Well Details

Well ID: 0565221313003
Loading map...
Location: 00/13-13-056-22W5/3
Location Alias: 00/13-13-56-22 W5M
Location Alias 2: 00/13-13-056-22 W5/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 22
Section: 13
County/Municipality: Yellowhead County
Well Name: ACL CECILIA 13-13-56-22
Operator Name: Paramount Resources Ltd.
License Number: 0358280
License Date: 2006-06-02
License Status: Amended
Spud Date: 2006-07-28
Final Drill Date: 2006-08-17
Well Total Depth: 2777.00 m
Surface Hole Latitude: 53.844135
Surface Hole Longitude: -117.144583

For data sources see[1][2]

Well History

Date Event
2006-06-02 Obtained License
2006-08-01 Surface Casing Operation Performed
2006-08-09 Direction Drilling Operation Performed - Deviate
2006-08-17 Finished Drilling
2006-08-17 Well Log Performed
2006-08-17 Well Mode changed to Drilled and Cased
2006-08-18 Well Log Performed
2006-08-19 Production Casing Operation Performed
2006-08-20 Rig Released
2006-08-25 Well Log Performed
2006-08-27 Perforation Treatment Performed - Jet Perforation
2006-08-28 Perforation Treatment Performed - Fractured
2006-08-31 Perforation Treatment Performed - Jet Perforation
2006-09-01 Perforation Treatment Performed - Fractured
2006-09-03 Well Log Performed
2006-09-04 Perforation Treatment Performed - Jet Perforation
2006-09-05 Perforation Treatment Performed - Fractured
2006-10-14 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-08-09 1966.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-08-27 Perforation 2728.50 2732.50 2
2006-09-01 Fracture 2587.50 2588.50 0
2006-09-04 Perforation 2392.00 2394.00 20
2006-09-04 Perforation 2399.00 2404.00 20
2006-09-05 Fracture 2392.00 2404.00 0
2006-08-27 Perforation 2751.50 2757.50 2
2006-08-27 Perforation 2760.00 2763.00 2
2006-08-28 Fracture 2728.50 2763.00 0
2006-08-31 Perforation 2684.00 2686.50 2
2006-08-31 Perforation 2627.00 2628.50 2
2006-08-31 Perforation 2587.50 2588.50 2
2006-09-01 Fracture 2684.00 2686.50 0
2006-09-01 Fracture 2627.00 2628.50 0

For data sources see[5]



References