X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565200202020

Well Details

Well ID: 0565200202020
Loading map...
Location: 02/02-02-056-20W5/0
Location Alias: 02/02-02-56-20 W5M
Location Alias 2: 02/02-02-056-20 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 20
Section: 02
County/Municipality: Yellowhead County
Well Name: DAYLIGHT ET AL 02 PINE 2-2-56-20
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0329528
License Date: 2005-04-19
License Status: Suspension
Spud Date: 2005-05-22
Final Drill Date: 2005-06-03
Well Total Depth: 2762.00 m
Surface Hole Latitude: 53.805905
Surface Hole Longitude: -116.859193

For data sources see[1][2]

Well History

Date Event
2005-04-19 Obtained License
2005-05-26 Surface Casing Operation Performed
2005-05-29 Direction Drilling Operation Performed - Deviate
2005-06-03 Finished Drilling
2005-06-03 Well Log Performed
2005-06-03 Well Mode changed to Drilled and Cased
2005-06-05 Production Casing Operation Performed
2005-06-05 Rig Released
2005-06-21 Well Log Performed
2005-06-23 Perforation Treatment Performed - Jet Perforation
2005-06-25 Well Fluid changed to Gas
2005-06-25 Well Mode changed to Testing
2005-06-26 Perforation Treatment Performed - Fractured
2005-06-29 Perforation Treatment Performed - Jet Perforation
2005-07-01 Perforation Treatment Performed - Fractured
2005-11-23 Well Began Production
2005-11-23 Well Fluid changed to Gas
2005-11-23 Well Mode changed to Flowing
2007-10-01 Well Fluid changed to Gas
2007-10-01 Well Mode changed to Flowing
2018-02-01 Well Fluid changed to Gas
2018-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-05-29 2026.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-23 Perforation 2537.00 2539.00 17
2005-06-23 Perforation 2540.00 2543.00 17
2005-06-26 Fracture 2537.00 2543.00 0
2005-06-29 Perforation 2515.00 2516.00 17
2005-07-01 Fracture 2515.00 2516.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 968 0.0 0.0 0.0
2006 7362 0.0 0.0 0.0
2007 8713 0.0 0.0 0.0
2008 8423 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 7536 0.0 0.0 0.0
2012 7514 0.0 0.0 0.0
2013 7084 0.0 0.0 0.0
2014 7439 0.0 0.0 0.0
2015 7173 0.0 0.0 0.0
2016 3261 0.0 0.0 0.0

For data sources see[6]

References