X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565192813003

Well Details

Well ID: 0565192813003
Loading map...
Location: 00/13-28-056-19W5/3
Location Alias: 00/13-28-56-19 W5M
Location Alias 2: 00/13-28-056-19 W5/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 19
Section: 28
County/Municipality: Yellowhead County
Well Name: CABRE PINE CREEK 13-28-56-19
Operator Name: Enerplus Corporation
License Number: 0242203
License Date: 2000-09-18
License Status: Issued
Spud Date: 2000-09-29
Final Drill Date: 2000-09-30
Well Total Depth: 2825.10 m
Surface Hole Latitude: 53.872564
Surface Hole Longitude: -116.770487

For data sources see[1][2]

Well History

Date Event
2000-09-18 Obtained License
2000-09-30 Finished Drilling
2000-09-30 Perforation Treatment Performed - Jet Perforation
2000-09-30 Well Mode changed to Drilled and Cased
2000-10-01 Well Log Performed
2000-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-02 Perforation Treatment Performed - Cement Squeeze
2000-10-02 Plug Back Performed
2000-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-06 Well Log Performed
2000-10-07 Perforation Treatment Performed - Jet Perforation
2000-10-07 Well Log Performed
2000-10-15 Rig Released
2001-03-20 Well Began Production
2001-03-20 Well Fluid changed to Gas
2001-03-20 Well Mode changed to Flowing
2009-10-24 Perforation Treatment Performed - Jet Perforation
2009-10-24 Well Fluid changed to Gas
2009-10-24 Well Log Performed
2009-10-24 Well Mode changed to Flowing
2009-10-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-09-30 Perforation 2505.00 2519.00 13
2000-10-02 Acid Treatment 2505.00 2519.00 0
2000-10-02 Cement Squeeze 2505.00 2519.00 0
2000-10-06 Packing Device Capped w/Cement 2792.00 2800.00 0
2000-10-07 Perforation 2763.00 2770.00 17
2009-10-24 Perforation 2685.00 2691.00 17
2009-10-29 Fracture 2685.00 2691.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 3960 0.0 0.0 0.0
2002 2012 0.0 0.0 0.0
2003 5621 0.0 0.0 0.0
2004 6629 0.0 0.0 0.0
2005 7861 0.0 0.0 0.0
2006 6979 0.0 0.0 0.0
2007 7399 0.0 0.0 0.0
2008 7742 0.0 0.0 0.0
2009 7357 0.0 0.0 0.0
2010 5864 0.0 0.0 0.0
2011 6746 0.0 0.0 0.0
2012 7163 0.0 0.0 0.0
2013 7340 0.0 0.0 0.0
2014 5950 0.0 0.0 0.0
2015 7985 0.0 0.0 0.0
2016 7469 0.0 0.0 0.0
2017 8182 0.0 0.0 0.0
2018 5585 0.0 0.0 0.0
2019 6723 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References