If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565181501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.834035,"lon":-116.601572,"icon":""}]} |
Location: 00/01-15-056-18W5/0 | |
Location Alias: 00/01-15-56-18 W5M | |
Location Alias 2: 00/01-15-056-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 18 | |
Section: 15 | |
County/Municipality: Yellowhead County | |
Well Name: LONG RUN PINE CK 1-15-56-18 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0433593 | |
License Date: 2011-05-17 | |
License Status: Issued | |
Spud Date: 2011-07-30 | |
Final Drill Date: 2011-08-27 | |
Well Total Depth: 3810.00 m | |
Surface Hole Latitude: 53.834035 | |
Surface Hole Longitude: -116.601572 |
Date | Event |
---|---|
2011-05-17 | Obtained License |
2011-08-01 | Surface Casing Operation Performed |
2011-08-06 | Direction Drilling Operation Performed - Horizontal |
2011-08-14 | Intermediate Casing Operation Performed |
2011-08-27 | Finished Drilling |
2011-08-27 | Perforation Treatment Performed - Open-Hole Completion |
2011-08-27 | Well Mode changed to Drilled and Cased |
2011-08-29 | Liner Casing Operation Performed |
2011-08-29 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-01 | Rig Released |
2011-10-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-12-04 | Well Began Production |
2011-12-04 | Well Fluid changed to Gas |
2011-12-04 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-06 | 2341.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-27 | Open Hole/Barefoot Completion | 2649.00 | 3810.00 | 0 |
2011-08-29 | Open Hole/Barefoot Completion | 3282.00 | 3810.00 | 0 |
2011-10-24 | Multi-Stage Fracture | 3205.80 | 3205.90 | 0 |
2011-10-25 | Multi-Stage Fracture | 3110.80 | 3110.90 | 0 |
2011-10-25 | Multi-Stage Fracture | 3005.90 | 3006.00 | 0 |
2011-10-25 | Multi-Stage Fracture | 2913.30 | 2913.40 | 0 |
2011-10-25 | Multi-Stage Fracture | 2809.20 | 2809.30 | 0 |
2011-10-26 | Multi-Stage Fracture | 2704.90 | 2705.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 648 | 0.0 | 0.0 | 0.0 |
2012 | 8120 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8159 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8700 | 0.0 | 0.0 | 0.0 |
2018 | 8598 | 0.0 | 0.0 | 0.0 |
2019 | 8360 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]