X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565180306000

Well Details

Well ID: 0565180306000
Loading map...
Location: 00/06-03-056-18W5/0
Location Alias: 00/06-03-56-18 W5M
Location Alias 2: 00/06-03-056-18 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 18
Section: 03
County/Municipality: Yellowhead County
Well Name: WISER ET AL PINE CREEK 6-3-56-18
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0168155
License Date: 1994-06-24
License Status: Re-Entered
Spud Date: 1994-07-18
Final Drill Date: 1994-08-06
Well Total Depth: 2712.00 m
Surface Hole Latitude: 53.808433
Surface Hole Longitude: -116.591883

For data sources see[1][2]

Well History

Date Event
1994-06-24 Obtained License
1994-07-20 Surface Casing Operation Performed
1994-08-06 Finished Drilling
1994-08-06 Well Log Performed
1994-08-08 Drill Stem Test Performed
1994-08-09 Drill Stem Test Performed
1994-08-11 Production Casing Operation Performed
1994-08-11 Rig Released
1994-08-23 Perforation Treatment Performed - Jet Perforation
1994-08-25 Well Log Performed
1994-08-27 Perforation Treatment Performed - Jet Perforation
1994-08-28 Well Log Performed
1994-08-30 Perforation Treatment Performed - Jet Perforation
1994-09-01 Perforation Treatment Performed - Fractured
1994-11-09 Perforation Treatment Performed - Cement Squeeze
1994-11-09 Plug Back Performed
1994-11-15 Perforation Treatment Performed - Fractured
1995-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-19 Plug Back Performed
1995-01-20 Perforation Treatment Performed - Jet Perforation
1995-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-24 Plug Back Performed
1995-01-24 Well Abandoned
1995-01-24 Well Mode changed to Abandoned and Re-entered
1995-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-25 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-08-23 Perforation 2540.00 2545.00 14
1995-01-22 Acid Treatment 2091.00 2100.00 0
1995-01-24 Packing Device Capped w/Cement 2078.00 2086.00 0
1995-01-25 Packing Device Capped w/Cement 1877.00 1885.00 0
1994-08-27 Perforation 2493.50 2499.00 14
1994-08-30 Perforation 1890.00 1893.00 14
1994-09-01 Fracture 1890.00 1893.00 0
1994-11-09 Cement Squeeze 1890.00 1893.00 0
1994-11-15 Fracture 2493.50 2499.00 0
1995-01-19 Packing Device Capped w/Cement 2527.00 2535.00 0
1995-01-19 Packing Device Capped w/Cement 2482.00 2490.00 0
1995-01-20 Perforation 2091.00 2100.00 18

For data sources see[4]



References