X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565162201020

Well Details

Well ID: 0565162201020
Loading map...
Location: 02/01-22-056-16W5/0
Location Alias: 02/01-22-56-16 W5M
Location Alias 2: 02/01-22-056-16 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 16
Section: 22
County/Municipality: Yellowhead County
Well Name: BEC HZ MCLEOD 1-22-56-16
Operator Name: Ish Energy Ltd.
License Number: 0490027
License Date: 2018-07-17
License Status: Issued
Spud Date: 2018-08-10
Final Drill Date: 2018-08-25
Well Total Depth: 4715.00 m
Surface Hole Latitude: 53.871501
Surface Hole Longitude: -116.282713

For data sources see[1][2]

Well History

Date Event
2018-07-17 Obtained License
2018-08-12 Surface Casing Operation Performed
2018-08-13 Direction Drilling Operation Performed - Deviate
2018-08-15 Direction Drilling Operation Performed - Horizontal
2018-08-17 Intermediate Casing Operation Performed
2018-08-25 Finished Drilling
2018-08-25 Well Log Performed
2018-08-25 Well Mode changed to Drilled and Cased
2018-08-28 Liner Casing Operation Performed
2018-08-28 Perforation Treatment Performed - Open-Hole Completion
2018-08-28 Rig Released
2018-09-06 Well Log Performed
2018-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-27 Well Fluid changed to Gas
2018-09-27 Well Mode changed to Testing
2018-10-01 Well Began Production
2018-10-01 Well Fluid changed to Gas
2018-10-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-10 Savanna Drilling Corp. 638 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-13 1873.70 Deviate (5 - 79 degrees)
2018-08-15 2336.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-28 Open Hole/Barefoot Completion 4709.00 4715.00 0
2018-09-21 Multi-Stage Fracture 3895.90 3896.00 0
2018-09-21 Multi-Stage Fracture 3799.60 3799.70 0
2018-09-21 Multi-Stage Fracture 3703.00 3703.10 0
2018-09-21 Multi-Stage Fracture 3613.70 3613.80 0
2018-09-21 Multi-Stage Fracture 3505.40 3505.50 0
2018-09-21 Multi-Stage Fracture 3410.00 3410.10 0
2018-09-21 Multi-Stage Fracture 3315.30 3315.40 0
2018-09-21 Multi-Stage Fracture 3219.60 3219.70 0
2018-09-21 Multi-Stage Fracture 3123.60 3123.70 0
2018-09-21 Multi-Stage Fracture 3028.00 3028.10 0
2018-09-20 Multi-Stage Fracture 4657.80 4657.90 0
2018-09-21 Multi-Stage Fracture 2931.20 2931.30 0
2018-09-21 Multi-Stage Fracture 2837.00 2837.10 0
2018-09-21 Multi-Stage Fracture 2741.50 2741.60 0
2018-09-21 Multi-Stage Fracture 2644.90 2645.00 0
2018-09-21 Multi-Stage Fracture 2548.60 2548.70 0
2018-09-21 Multi-Stage Fracture 2465.90 2466.00 0
2018-09-20 Multi-Stage Fracture 4572.40 4572.50 0
2018-09-20 Multi-Stage Fracture 4463.30 4463.40 0
2018-09-20 Multi-Stage Fracture 4369.00 4369.10 0
2018-09-20 Multi-Stage Fracture 4277.50 4277.60 0
2018-09-20 Multi-Stage Fracture 4182.20 4182.30 0
2018-09-20 Multi-Stage Fracture 4085.90 4086.00 0
2018-09-21 Multi-Stage Fracture 3989.80 3989.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-20 2018-09-21 2,221 4,001 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 11.7321 N/A
Water 7732-18-5 100 76.1521 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 11.8274 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0226 N/A
Methyl Alcohol 67-56-1 100 0.0226 N/A
Non-Hazardous Ingredients Not Available 100 0.0226 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1054 N/A
Non-Hazardous Ingredients Not Available 100 0.1054 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0823 N/A
Non-Hazardous Ingredients Not Available 100 0.0823 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0823 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0075 N/A
Non-Hazardous Ingredients Not Available 100 0.0075 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0701 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0701 N/A
Methanol 67-56-1 100 0.0701 N/A
Monoethanolamine 141-43-5 100 0.0701 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0701 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0701 N/A
Water 7732-18-5 100 0.0701 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-08 2018-09-11 Surface Water - Runoff 4000

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2279 0.0 0.0 0.0
2019 3133 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-25 No Incident Encountered 0.00 0.00
2018-09-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References