X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565161801002

Well Details

Well ID: 0565161801002
Loading map...
Location: 00/01-18-056-16W5/2
Location Alias: 00/01-18-56-16 W5M
Location Alias 2: 00/01-18-056-16 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 16
Section: 18
County/Municipality: Yellowhead County
Well Name: ISH GROAT 1-18-56-16
Operator Name: Ish Energy Ltd.
License Number: 0114728
License Date: 1985-05-21
License Status: Issued
Spud Date: 1985-05-24
Final Drill Date: 1985-06-26
Well Total Depth: 3009.00 m
Surface Hole Latitude: 53.834687
Surface Hole Longitude: -116.356073

For data sources see[1][2]

Well History

Date Event
1985-05-21 Obtained License
1985-05-26 Surface Casing Operation Performed
1985-05-28 Direction Drilling Operation Performed - Deviate
1985-06-11 Well Log Performed
1985-06-12 Drill Stem Test Performed
1985-06-12 Well Log Performed
1985-06-24 Kick Occurred
1985-06-25 Drill Stem Test Performed
1985-06-26 Finished Drilling
1985-06-26 Well Mode changed to Drilled and Cased
1985-06-27 Well Log Performed
1985-06-29 Production Casing Operation Performed
1985-06-30 Rig Released
1986-01-22 Well Log Performed
1986-01-24 Well Log Performed
1986-01-25 Perforation Treatment Performed - Jet Perforation
1986-01-26 Well Log Performed
1986-01-29 Perforation Treatment Performed - Cement Squeeze
1986-01-29 Well Log Performed
1986-01-30 Perforation Treatment Performed - Jet Perforation
1994-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-27 Perforation Treatment Performed - Jet Perforation
1994-02-27 Plug Back Performed
1994-02-27 Well Log Performed
1994-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-05 Perforation Treatment Performed - Remedial Casing
1994-03-07 Perforation Treatment Performed - Jet Perforation
1994-03-08 Well Log Performed
1994-03-10 Perforation Treatment Performed - Fractured
1994-08-19 Well Began Production
1994-08-19 Well Fluid changed to Gas
1994-08-19 Well Mode changed to Flowing
2000-03-07 Perforation Treatment Performed - Jet Perforation
2000-03-07 Well Log Performed
2000-03-09 Perforation Treatment Performed - Cement Squeeze
2000-03-14 Well Log Performed
2000-03-15 Perforation Treatment Performed - Jet Perforation
2000-03-15 Well Log Performed
2000-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-17 Perforation Treatment Performed - Cement Squeeze
2000-03-21 Well Log Performed
2000-03-22 Perforation Treatment Performed - Jet Perforation
2000-03-22 Well Log Performed
2000-03-23 Well Log Performed
2000-03-27 Perforation Treatment Performed - Cement Squeeze
2000-03-27 Perforation Treatment Performed - Jet Perforation
2000-03-29 Well Log Performed
2000-03-30 Perforation Treatment Performed - Jet Perforation
2000-03-30 Well Fluid changed to Gas
2000-03-30 Well Log Performed
2000-03-30 Well Mode changed to Flowing
2000-04-01 Perforation Treatment Performed - Fractured
2004-05-21 Perforation Treatment Performed - Cement Squeeze
2004-06-09 Perforation Treatment Performed - Jet Perforation
2004-06-09 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-05-28 536.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-25 Perforation 2948.50 2949.00 13
1994-03-10 Fracture 1971.00 1975.00 0
2000-03-07 Perforation 1617.00 1618.00 14
2000-03-07 Perforation 1552.00 1553.00 14
2000-03-09 Cement Squeeze 1552.00 1618.00 0
2000-03-15 Perforation 1607.00 1608.00 14
2000-03-15 Perforation 1556.00 1557.00 14
2000-03-16 Acid Treatment 1556.00 1608.00 0
2000-03-17 Cement Squeeze 1556.00 1608.00 0
2000-03-22 Perforation 1600.00 1601.00 17
2000-03-22 Perforation 1572.50 1573.50 17
1986-01-29 Cement Squeeze 2948.50 2949.00 0
2000-03-27 Perforation 1564.50 1565.50 17
2000-03-27 Cement Squeeze 1564.50 1601.00 0
2000-03-30 Perforation 1583.00 1587.00 14
2000-04-01 Fracture 1583.00 1587.00 0
2004-05-21 Cement Squeeze 1583.00 1587.00 0
2004-06-09 Perforation 1971.00 1975.00 17
1986-01-30 Perforation 2942.50 2944.00 13
1994-02-27 Packing Device Capped w/Cement 2899.00 2907.00 0
1994-02-27 Perforation 1950.00 1951.00 14
1994-02-27 Perforation 2004.00 2205.00 14
1994-03-02 Acid Treatment 1950.00 1951.00 0
1994-03-05 Remedial Casing Cementing 1950.00 2205.00 0
1994-03-07 Perforation 1971.00 1975.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1814 0.0 0.0 0.0
1995 3125 0.0 0.0 0.0
1996 7260 0.0 0.0 0.0
1997 8055 0.0 0.0 0.0
1998 3675 0.0 0.0 0.0
2004 4618 0.0 0.0 0.0
2005 6440 0.0 0.0 0.0
2006 7920 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8345 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8576 0.0 0.0 0.0
2013 8257 0.0 0.0 0.0
2014 7967 0.0 0.0 0.0
2015 8543 0.0 0.0 0.0
2016 4585 0.0 0.0 0.0
2017 8207 0.0 0.0 0.0
2018 8687 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-06-24 Kick 2963.00 2963.00
2004-05-26 No Incident Encountered 0.00 0.00
2004-05-30 No Incident Encountered 0.00 0.00
2004-06-02 No Incident Encountered 0.00 0.00
2004-06-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References