X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565092510002

Well Details

Well ID: 0565092510002
Loading map...
Location: 00/10-25-056-09W5/2
Location Alias: 00/10-25-56-09 W5M
Location Alias 2: 00/10-25-056-09 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 09
Section: 25
County/Municipality: Lac Ste. Anne County
Well Name: FMEL PADDLER 10-25-56-9
Operator Name: Point Loma Resources Ltd.
License Number: 0014090
License Date: 1957-10-08
License Status: Suspension
Spud Date: 1957-10-29
Final Drill Date: 1957-11-18
Well Total Depth: 1581.30 m
Surface Hole Latitude: 53.869758
Surface Hole Longitude: -115.201172

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-10-08 Obtained License
1957-11-18 Drill Stem Test Performed
1957-11-18 Finished Drilling
1957-11-18 Well Mode changed to Drilled and Cased
1957-11-19 Production Casing Operation Performed
1959-05-27 Perforation Treatment Performed - Jet Perforation
1959-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-06-15 Perforation Treatment Performed - Fractured
1960-06-30 Perforation Treatment Performed - Bullet Perforation
1960-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-29 Well Began Production
1960-07-29 Well Fluid changed to Crude Oil
1960-07-29 Well Mode changed to Flowing
1964-03-18 Perforation Treatment Performed - Jet Perforation
1971-01-12 Well Fluid changed to Crude Oil
1971-01-12 Well Mode changed to Suspended
1972-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-05-12 Well Fluid changed to Crude Oil
1972-05-12 Well Mode changed to Abandoned Zone
1990-10-04 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-05-27 Perforation 1530.10 1531.60 13
1972-05-12 Packing Device Capped w/Cement 1541.40 1544.40 0
1990-10-04 Chemical Squeeze 1530.10 1540.20 0
1959-05-27 Perforation 1532.20 1535.90 13
1959-05-27 Perforation 1536.50 1540.20 13
1959-06-09 Acid Treatment 1530.10 1540.20 0
1959-06-15 Fracture 1530.10 1540.20 0
1960-06-30 Bullet Perforation 1559.40 1560.90 13
1960-07-07 Acid Treatment 1559.40 1560.90 0
1960-07-26 Acid Treatment 1559.40 1560.90 0
1964-03-18 Perforation 1557.50 1558.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1967 4971 0.0 0.0 0.0
1968 4787 0.0 0.0 0.0
1969 2629 0.0 0.0 0.0
1970 7941 0.0 0.0 0.0
1971 240 0.0 0.0 0.0

For data sources see[5]

References