X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565081716000

Well Details

Well ID: 0565081716000
Loading map...
Location: 00/16-17-056-08W5/0
Location Alias: 00/16-17-56-08 W5M
Location Alias 2: 00/16-17-056-08 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 17
County/Municipality: Lac Ste. Anne County
Well Name: FMEL PADDLER 16-17-56-8
Operator Name: Point Loma Resources Ltd.
License Number: 0011667
License Date: 1956-06-20
License Status: Suspension
Spud Date: 1956-07-17
Final Drill Date: 1956-08-13
Well Total Depth: 1645.90 m
Surface Hole Latitude: 53.844265
Surface Hole Longitude: -115.145487

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-06-20 Obtained License
1956-07-27 Drill Stem Test Performed
1956-07-28 Drill Stem Test Performed
1956-08-04 Drill Stem Test Performed
1956-08-05 Drill Stem Test Performed
1956-08-06 Drill Stem Test Performed
1956-08-13 Finished Drilling
1956-08-13 Well Mode changed to Drilled and Cased
1956-08-15 Production Casing Operation Performed
1956-08-15 Well Log Performed
1956-08-18 Perforation Treatment Performed - Acid Wash - No Pressure
1956-08-18 Perforation Treatment Performed - Bullet Perforation
1956-08-21 Perforation Treatment Performed - Acid Wash - No Pressure
1956-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-08-21 Perforation Treatment Performed - Bullet Perforation
1956-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-08-23 Perforation Treatment Performed - Bullet Perforation
1956-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-08-27 Perforation Treatment Performed - Cement Squeeze
1956-08-28 Perforation Treatment Performed - Acid Wash - No Pressure
1956-08-28 Perforation Treatment Performed - Bullet Perforation
1956-08-31 Perforation Treatment Performed - Cement Squeeze
1956-09-01 Perforation Treatment Performed - Acid Wash - No Pressure
1956-09-01 Perforation Treatment Performed - Bullet Perforation
1956-09-25 Well Began Production
1956-09-25 Well Fluid changed to Crude Oil
1956-09-25 Well Mode changed to Flowing
1957-01-27 Perforation Treatment Performed - Cement Squeeze
1957-01-27 Perforation Treatment Performed - Jet Perforation
1957-01-29 Perforation Treatment Performed - Jet Perforation
1957-01-31 Perforation Treatment Performed - Cement Squeeze
1957-02-06 Perforation Treatment Performed - Acid Wash - No Pressure
1957-02-08 Perforation Treatment Performed - Acid Wash - No Pressure
1957-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1957-02-12 Perforation Treatment Performed - Cement Squeeze
1957-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1957-02-13 Perforation Treatment Performed - Jet Perforation
1957-02-14 Perforation Treatment Performed - Acid Wash - No Pressure
1957-11-13 Well Fluid changed to Crude Oil
1957-11-13 Well Mode changed to Suspended
1958-01-29 Drill Stem Test Performed
1977-10-08 Perforation Treatment Performed - Cement Squeeze
1989-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-28 Plug Back Performed
1989-10-28 Well Fluid changed to Crude Oil
1989-10-28 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-08-18 Bullet Perforation 1625.20 1628.50 0
1956-08-28 Bullet Perforation 1588.60 1592.90 13
1956-08-28 Acid Wash 1588.60 1592.90 0
1956-08-31 Cement Squeeze 1588.60 1592.90 0
1956-09-01 Bullet Perforation 1583.70 1588.00 13
1956-09-01 Acid Wash 1583.70 1588.00 0
1957-01-27 Perforation 1573.40 1573.70 13
1957-01-27 Cement Squeeze 1573.40 1573.70 0
1957-01-29 Perforation 1562.70 1563.00 13
1957-01-31 Cement Squeeze 1562.70 1563.00 0
1957-02-06 Acid Wash 1583.70 1587.40 0
1956-08-18 Acid Wash 1625.20 1628.50 0
1957-02-08 Acid Wash 1583.70 1587.40 0
1957-02-11 Packing Device Capped w/Cement 1580.40 1580.40 0
1957-02-12 Cement Squeeze 1573.40 1573.70 0
1957-02-13 Packing Device Capped w/Cement 1570.30 1570.30 0
1957-02-13 Perforation 1566.70 1569.70 13
1957-02-14 Acid Wash 1566.70 1569.70 0
1977-10-08 Cement Squeeze 1566.70 1569.70 0
1989-10-28 Packing Device Capped w/Cement 1300.00 1410.00 0
1956-08-21 Packing Device Capped w/Cement 1624.00 1624.00 0
1956-08-21 Bullet Perforation 1618.50 1622.80 0
1956-08-21 Acid Wash 1618.50 1622.80 0
1956-08-23 Packing Device Capped w/Cement 1614.20 1614.20 0
1956-08-23 Bullet Perforation 1597.20 1600.20 0
1956-08-24 Packing Device Capped w/Cement 1612.40 1612.40 0
1956-08-27 Cement Squeeze 1597.20 1600.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1977 18 0.0 0.0 0.0

For data sources see[5]

References