X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565081311000

Well Details

Well ID: 0565081311000
Loading map...
Location: 00/11-13-056-08W5/0
Location Alias: 00/11-13-56-08 W5M
Location Alias 2: 00/11-13-056-08 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 13
County/Municipality: Lac Ste. Anne County
Well Name: KANATA ET AL PADDLER 11-13-56-8
Operator Name: Canden Resources Ltd.
License Number: 0070311
License Date: 1978-06-23
License Status: RecCertified
Spud Date: 1978-06-29
Final Drill Date: 1978-07-10
Well Total Depth: 1571.50 m
Surface Hole Latitude: 53.839310
Surface Hole Longitude: -115.061256

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-23 Obtained License
1978-07-10 Finished Drilling
1978-07-11 Drill Stem Test Performed
1978-07-12 Drill Stem Test Performed
1978-07-14 Production Casing Operation Performed
1978-10-24 Perforation Treatment Performed - Jet Perforation
1978-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-23 Well Mode changed to Drilled and Cased
1979-02-15 Perforation Treatment Performed - Jet Perforation
1979-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-02-25 Perforation Treatment Performed - Fractured
1993-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-20 Plug Back Performed
1993-09-20 Well Mode changed to Abandoned
1993-09-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-24 Perforation 1546.60 1549.00 13
1978-11-22 Acid Treatment 1546.60 1549.00 0
1979-02-15 Perforation 1555.00 1558.70 7
1979-02-15 Perforation 1559.90 1562.40 7
1979-02-19 Acid Treatment 1555.00 1562.40 0
1979-02-25 Fracture 1555.00 1562.40 0
1993-09-20 Packing Device Capped w/Cement 1532.00 1540.00 0

For data sources see[4]



References