X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565063204000

Well Details

Well ID: 0565063204000
Loading map...
Location: 00/04-32-056-06W5/0
Location Alias: 00/04-32-56-06 W5M
Location Alias 2: 00/04-32-056-06 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 06
Section: 32
County/Municipality: Lac Ste. Anne County
Well Name: WLEC CHERHILL 4-32-56-6
Operator Name: West Lake Energy Corp.
License Number: 0166578
License Date: 1994-04-22
License Status: Suspension
Spud Date: 1994-05-26
Final Drill Date: 1994-06-01
Well Total Depth: 1456.00 m
Surface Hole Latitude: 53.877979
Surface Hole Longitude: -114.864816

For data sources see[1][2]

Well History

Date Event
1994-04-22 Obtained License
1994-05-27 Surface Casing Operation Performed
1994-06-01 Finished Drilling
1994-06-01 Well Mode changed to Drilled and Cased
1994-06-02 Well Log Performed
1994-06-03 Drill Stem Test Performed
1994-06-05 Production Casing Operation Performed
1994-06-05 Rig Released
1994-06-23 Well Log Performed
1994-06-24 Perforation Treatment Performed - Jet Perforation
1994-06-24 Well Log Performed
1994-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-07 Well Log Performed
1994-07-08 Perforation Treatment Performed - Jet Perforation
1998-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-01 Well Began Production
1998-11-01 Well Fluid changed to Gas
1998-11-01 Well Mode changed to Flowing
2013-10-15 Well Fluid changed to Gas
2013-10-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-06-24 Perforation 1400.00 1401.00 14
1994-06-24 Perforation 1403.00 1406.50 14
1994-06-24 Perforation 1409.50 1410.50 14
1994-06-27 Acid Treatment 1400.00 1410.50 0
1994-07-07 Packing Device Capped w/Cement 1396.00 1399.00 0
1994-07-08 Perforation 1390.00 1392.00 14
1998-06-04 Acid Treatment 1390.00 1392.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1197 0.0 0.0 0.0
1999 8484 0.0 0.0 0.0
2000 8649 0.0 0.0 0.0
2001 8626 0.0 0.0 0.0
2002 8506 0.0 0.0 0.0
2003 8744 0.0 0.0 0.0
2004 8732 0.0 0.0 0.0
2005 8668 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8678 0.0 0.0 0.0
2008 8543 0.0 0.0 0.0
2009 8211 0.0 0.0 0.0
2010 8167 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8675 0.0 0.0 0.0
2013 2423 0.0 0.0 0.0

For data sources see[5]

References