X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565062216000

Well Details

Well ID: 0565062216000
Loading map...
Location: 00/16-22-056-06W5/0
Location Alias: 00/16-22-56-06 W5M
Location Alias 2: 00/16-22-056-06 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 06
Section: 22
County/Municipality: Lac Ste. Anne County
Well Name: PIONEER CANADA CHERHILL 16-22-56-6
Operator Name: TAQA North Ltd.
License Number: 0065618
License Date: 1977-09-08
License Status: RecCertified
Spud Date: 1977-09-09
Final Drill Date: 1977-09-16
Well Total Depth: 1402.10 m
Surface Hole Latitude: 53.859032
Surface Hole Longitude: -114.799616

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-08 Obtained License
1977-09-16 Finished Drilling
1977-09-16 Well Mode changed to Drilled and Cased
1977-09-17 Drill Stem Test Performed
1977-09-18 Drill Stem Test Performed
1977-09-18 Production Casing Operation Performed
1977-11-09 Perforation Treatment Performed - Jet Perforation
1977-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-11 Perforation Treatment Performed - Cement Squeeze
1978-01-15 Perforation Treatment Performed - Jet Perforation
1978-01-25 Perforation Treatment Performed - Cement Squeeze
1978-02-06 Perforation Treatment Performed - Jet Perforation
1978-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-13 Perforation Treatment Performed - Cement Squeeze
1978-02-15 Perforation Treatment Performed - Jet Perforation
1978-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-06 Well Began Production
1978-03-06 Well Fluid changed to Crude Oil
1978-03-06 Well Mode changed to Pumping
1982-03-17 Well Fluid changed to Crude Oil
1982-03-17 Well Mode changed to Suspended
1989-03-17 Well Log Performed
1989-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-18 Plug Back Performed
1989-03-18 Well Fluid changed to Crude Oil
1989-03-18 Well Mode changed to Abandoned
1989-03-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-09 Perforation 1358.80 1366.10 7
1978-02-17 Acid Treatment 1156.40 1158.20 0
1989-03-18 Packing Device Capped w/Cement 1137.00 1145.00 0
1977-11-10 Acid Treatment 1358.80 1366.10 0
1978-01-11 Cement Squeeze 1358.80 1366.10 0
1978-01-15 Perforation 1360.60 1362.50 7
1978-01-25 Cement Squeeze 1360.60 1362.50 0
1978-02-06 Perforation 1155.20 1157.00 7
1978-02-08 Acid Treatment 1155.20 1157.00 0
1978-02-13 Cement Squeeze 1155.20 1157.00 0
1978-02-15 Perforation 1156.40 1158.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 6403 0.0 0.0 0.0
1979 6762 0.0 0.0 0.0
1980 5462 0.0 0.0 0.0
1981 280 0.0 0.0 0.0

For data sources see[5]

References