X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565052516000

Well Details

Well ID: 0565052516000
Loading map...
Location: 00/16-25-056-05W5/0
Location Alias: 00/16-25-56-05 W5M
Location Alias 2: 00/16-25-056-05 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 05
Section: 25
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 16-25-56-5
Operator Name: Journey Energy Inc.
License Number: 0104101
License Date: 1983-11-14
License Status: Suspension
Spud Date: 1984-01-16
Final Drill Date: 1984-01-26
Well Total Depth: 1360.00 m
Surface Hole Latitude: 53.871059
Surface Hole Longitude: -114.600541

For data sources see[1][2]

Well History

Date Event
1983-11-14 Obtained License
1984-01-16 Direction Drilling Operation Performed - 98
1984-01-26 Finished Drilling
1984-01-26 Well Log Performed
1984-01-26 Well Mode changed to Drilled and Cased
1984-01-28 Production Casing Operation Performed
1984-02-07 Well Log Performed
1984-02-29 Perforation Treatment Performed - Jet Perforation
1984-02-29 Well Log Performed
1984-03-02 Perforation Treatment Performed - Jet Perforation
1984-03-02 Well Log Performed
1984-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-08 Well Began Production
1984-03-08 Well Fluid changed to Crude Oil
1984-03-08 Well Mode changed to Flowing
1997-06-16 Well Fluid changed to Crude Oil
1997-06-16 Well Mode changed to Pumping
1998-06-25 Perforation Treatment Performed - Jet Perforation
1998-06-25 Well Log Performed
2007-06-04 Perforation Treatment Performed - Cement Squeeze
2007-06-09 Perforation Treatment Performed - Jet Perforation
2007-06-09 Well Log Performed
2007-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-07-15 Well Fluid changed to Crude Oil
2009-07-15 Well Mode changed to Suspended
2009-08-24 Perforation Treatment Performed - Cement Squeeze
2009-08-29 Well Log Performed
2009-09-01 Well Fluid changed to Crude Oil
2009-09-01 Well Mode changed to Pumping
2009-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-09-02 Perforation Treatment Performed - Jet Perforation
2009-09-02 Well Log Performed
2009-10-01 Well Fluid changed to Crude Oil
2009-10-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-01-16 677.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-29 Perforation 1327.50 1332.00 13
2009-08-24 Cement Squeeze 1317.70 1332.00 0
2009-09-02 Perforation 1340.00 1346.00 17
2009-09-02 Acid Treatment 1340.00 1346.00 0
1984-03-02 Perforation 1317.70 1323.50 13
1984-03-03 Acid Treatment 1317.70 1332.00 0
1998-06-25 Perforation 1301.00 1303.50 14
1998-06-25 Perforation 1305.00 1307.00 14
2007-06-04 Cement Squeeze 1301.00 1307.00 0
2007-06-09 Perforation 1327.50 1332.00 20
2007-06-09 Perforation 1317.70 1323.50 20
2007-06-10 Acid Treatment 1317.70 1332.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 5130 0.0 0.0 0.0
1985 5920 0.0 0.0 0.0
1986 4681 0.0 0.0 0.0
1987 4152 0.0 0.0 0.0
1988 6221 0.0 0.0 0.0
1989 6813 0.0 0.0 0.0
1990 3733 0.0 0.0 0.0
1991 3910 0.0 0.0 0.0
1992 6988 0.0 0.0 0.0
1993 8372 0.0 0.0 0.0
1994 8322 0.0 0.0 0.0
1995 8582 0.0 0.0 0.0
1996 8490 0.0 0.0 0.0
1997 8552 0.0 0.0 0.0
1998 4038 0.0 0.0 0.0
2007 3181 0.0 0.0 0.0
2008 1745 0.0 0.0 0.0

For data sources see[6]

References